Browse
Search
OUTBoard agenda 101619
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2019
>
OUTBoard agenda 101619
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 10:07:21 AM
Creation date
11/4/2019 9:45:29 AM
Metadata
Fields
Template:
BOCC
Date
10/16/2019
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> ORANGE COUNTY <br /> ORANGE UNIFIED TRANSPORTATION BOARD <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: October 16, 2019 <br /> Action Agenda <br /> Item No. 4.a. <br /> SUBJECT: NC 54 West Corridor Study Supplement (a.k.a. Phase II) <br /> DEPARTMENT: Planning and Inspections <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> 1. Draft Phase 2 Study Nishith Trivedi, Transportation Planner, <br /> 919-245-2582 <br /> Tom Altieri, Comprehensive Planning <br /> Supervisor, 919-245-2579 <br /> PURPOSE: To receive a presentation on the NC-54 West Corridor Study from Orange County <br /> Transportation Planning staff and provide comments. <br /> BACKGROUND: The NC-54 corridor study was started in September 2017 by the Durham- <br /> Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO) and North Carolina <br /> Department of Transportation (NCDOT). The study area spans from Old Fayetteville Road in <br /> Carrboro to the 1-85/1-40 interchange in Graham. VHB is the consultant assigned to the study <br /> and they completed the final report in November 2018, with every member jurisdiction <br /> participating in the consultant's and MPO's public process. The final recommendations serve to <br /> identify projects for consideration through future Strategic Prioritization of Transportation <br /> (SPOT) processes. <br /> On February 2019, Carrboro, through the DCHC MPO, requested VHB to review and confirm <br /> Phase 1 conclusions through a phase 2 study (Attachment 1) to analyze future trends and <br /> transit alternatives as mentioned in the final report, widening impact on local roads, and other <br /> improvements not on NC-54 (e.g. widening other roads or adding new roads as alternative <br /> improvements). VHB will present phase 2 of the study to the Board of County Commissioners <br /> on November 7, 2019. The MPO will consider taking action on the NC-54 West Corridor Study <br /> in November 2019 following a public hearing. <br /> FINANCIAL IMPACT: There is no immediate financial impact associated with this item. <br /> RECOMMENDATION(S): Staff recommends the OUTBoard provide comments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.