Browse
Search
ORC agenda 110619
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Ordinance Review Committee
>
Agendas
>
2019
>
ORC agenda 110619
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:38:42 AM
Creation date
11/4/2019 9:38:27 AM
Metadata
Fields
Template:
BOCC
Date
11/6/2019
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 2: Procedures <br /> Section 2.20: Stream Buffers –Use Authorization Certificate <br /> <br /> <br />Orange County, North Carolina – Unified Development Ordinance Page 2-70 <br /> <br />2.19.132.19.14 Notice of Activity Initiation <br />No person may initiate a land-disturbing activity before notifying the Erosion Control Officer of the <br />date that land-disturbing activity will begin. <br />2.19.142.19.15 Preconstruction Conference <br />When deemed necessary by the Erosion Control Officer a preconstruction conference may be <br />required. <br />SECTION 2.20: STREAM BUFFERS –USE AUTHORIZATION CERTIFICATE <br />2.20.1 Use Authorization Certificate <br />(A) Application Requirements <br />(1) An application for a Use Authorization Certificate shall be filed with the Erosion <br />Control Officer on forms provided by the Planning Department. <br />(2) Complete applications shall include the following: <br />(a) The name, address and phone number of the applicant; <br />(b) The nature of the activity to be conducted by the applicant; <br />(c) The location of the activity, including the jurisdiction; <br />(d) A map of sufficient detail to accurately delineate the boundaries of the <br />land to be utilized in carrying out the activity, the location and dimensions <br />of any disturbance in riparian buffers associated with the activity, and the <br />extent of riparian buffers on the land; <br />(e) An explanation of why this plan for the activity cannot be practically <br />accomplished, reduced or reconfigured to better minimize disturbance to <br />the riparian buffer, preserve aquatic life and habitat and protect water <br />quality; and <br />(f) Plans for any best management practices proposed to be used to control <br />the impacts associated with the activity. <br />(B) Timeframe for Review <br />(1) All requests shall be reviewed by the Erosion Control Officer and either approved <br />or denied within 60 days of receipt of a complete application. <br />(2) Failure to issue an approval or denial within 60 days shall constitute that the <br />applicant has demonstrated “no practical alternatives.” <br />(3) The Erosion Control Officer may attach conditions to the Authorization Certificate <br />that support the purpose, spirit and intent of the riparian buffer protection <br />program. <br />(C) Disputes <br />Any disputes over determinations regarding Authorization Certificates shall be referred to <br />the Division of Water Quality of the North Carolina Department of Environment and <br />Natural Resources for a decision. <br />SECTION 2.21: STORMWATER MANAGEMENT <br />2.21.1 Stormwater Management Plan <br />(A) Application Requirements <br />(1) An application for approval of a Stormwater Management Plan shall be filed with <br />the Erosion Control Officer on forms provided by the Planning Department. <br />10
The URL can be used to link to this page
Your browser does not support the video tag.