Browse
Search
Agenda - 04-17-2001-5d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 04-17-2001
>
Agenda - 04-17-2001-5d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:54:56 PM
Creation date
8/29/2008 10:30:42 AM
Metadata
Fields
Template:
BOCC
Date
4/17/2001
Document Type
Agenda
Agenda Item
5d
Document Relationships
Minutes - 04-17-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
RES-2001-041 Resolution Documenting the State of the Overall Efland Area Sewer System Plan
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~. <br />system plan when it approved the single public purpose, <br />temporary forcemain connection to serve Lloyd's Car Wash; and <br />WHEREAS, on August 25, 1997, the Orange County Board of <br />Commissioners approved a Bond Order for a sewer system expansion <br />related to the Efland Area Sewer System (approved by the voters <br />of Orange County on November 7, 1997), which ratified the <br />commitment of the Orange County Board of Commissioners to the <br />overall system plan's inclusion of Phase I West, Phase I East <br />and Phase II as recommended in the Revised Preliminary <br />Engineering Report of the Project prepared by Hazen and Sawyer, <br />P.C., Engineers; and <br />WHEREAS, on September 7, 1999, the Board of Commissioners <br />of Orange County approved a boundary and design change to the <br />overall system plan when it approved the single public purpose, <br />linear system extension to serve the Barber & Ross manufacturing <br />facility; and <br />WHEREAS, on August 15, 2000, the Board of Commissioners of <br />Orange County approved a boundary and design change to the <br />~, <br />overall system plan when it approved the sewer system extension <br />to serve the Richmond Hi11s Subdivision; and <br />WHEREAS, the present overall system plan boundary is <br />illustrated on the map which is an exhibit to this resolution <br />3 <br />and includes Phase I West, Phase I East, Phase II, the Rancor <br />
The URL can be used to link to this page
Your browser does not support the video tag.