2 <br /> revealed, "...a critical element of the building envelope, the continuous sheathing, was in fact, <br /> not continuous." The architect and engineer further reported that, "The breeches were irregular <br /> enough to confidently say that a contractor would not be able to find all breeches and seal them <br /> to prevent future water intrusion without removing all of the brick and cast stone." The scope of <br /> the current remediation project that was bid on two previous occasions does not include this <br /> additional scope of work which would add to the projected cost and duration of the project and <br /> may approach the cost and duration of new construction. <br /> The architect who is contracted to work on the Link Remediation Project is scheduled to present <br /> findings to the Board of Commissioners at the November 19, 2019 meeting. At that time, the <br /> architect will also present options to proceed, including the probable costs and duration for each <br /> option. <br /> As these options are evaluated and implemented, both an industrial hygienist and an <br /> occupational health professional who have been working with the County on this project have <br /> advised relocating the building occupants on a short but reasonable timeline. <br /> Budget Amendment #2-C provides an intermediate budget of $975,000 to relocate the Link <br /> Government Services Center building occupants for the remainder of FY 2019-20. Of this total <br /> amount, $127,000 in PAYGO funds will be redirected from two projects in the FY2019-20 <br /> Capital Budget to the Asset Management Services operating budget to fund operational costs <br /> related to rent, utilities, and maintenance. These capital projects will now be funded with debt <br /> proceeds. <br /> The remaining remediation related costs of $848,000 will be budgeted in the Link Center <br /> Remediation Capital Project. This increase will be debt financed. Additional funds needed <br /> beyond FY 2019-20 will be included in future fiscal year budget appropriations. <br /> Upon approval of this budget amendment, the current Link Center occupants will be relocated to <br /> four different locations: <br /> • The Public Defender's Office is being relocated to a leased building at 115 E. King Street. <br /> • Finance and Administrative Services, Public Affairs, the Arts Commission Director, and <br /> the Risk Manager will be relocated to a leased facility at 405 Meadowlands Drive. <br /> • The Homeless Services Coordinator will move to existing office space in the Housing and <br /> Community Development Department. <br /> • The remaining occupants, the County Manager's Office and the Clerk's Office, will move <br /> to the Whitted Building. <br /> The leased facilities and the Whitted facility will be modified to accommodate a long term <br /> relocation. <br /> This budget amendment amends the following Link Center Remediation Capital Project, as well <br /> as the Court Street Annex and Equipment & Vehicles Capital Project Ordinances: <br />