Browse
Search
Agenda 11-07-19 Item 6-a - NC 54 West Corridor Study - Phase 2
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2019
>
Agenda - 11-07-19 Regular Meeting
>
Agenda 11-07-19 Item 6-a - NC 54 West Corridor Study - Phase 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2019 4:34:52 PM
Creation date
10/31/2019 4:15:49 PM
Metadata
Fields
Template:
BOCC
Date
11/7/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda 11-07-2019 Regular Board Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2019\Agenda - 11-07-19 Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> MPO Board 10/9/2019 Item 8 <br /> Ref: 38587.01 <br /> October 1, 2019 <br /> Page 3 <br /> variation. Furthermore, travelers do not always base their route choices on minimum travel times, even if they have <br /> accurate real-time information and reliable short-range predictions (which is not typically the case). Some drivers <br /> prefer to avoid freeways; others are less comfortable on rural two-lane roads that may require passing. If travel- <br /> time reliability is critical, routes with longer(but more consistent and predictable)travel times may be preferred to <br /> the risk of a long delay. Also,this analysis considers only three very specific—though important—locations. There <br /> are countless other potential locations that would generate different travelsheds. <br /> Streetlight Data <br /> To better understand the origin/destination patterns of traffic on NC 54 west of Carrboro, an analysis was <br /> performed using a Streetlight dataset provided by DCHC.This dataset is comprised of anonymized location <br /> information obtained from personal electronic devices during weekdays (Monday through Thursday) in April, May, <br /> September, and October of 2016-18.The results summarized here are based on a sample of approximately 8,000 <br /> devices, representing about 29,000 individual trips.The Streetlight Index sample represents about 23%of the <br /> averaged 2016-2018 AADT on NC 54, based on Index-to-AADT ratios. <br /> The available Streetlight dataset did not include the entire NC 54 West study area (see Figure 4); only the portion of <br /> the corridor east of Orange Grove Road could be analyzed. Figure 5 depicts the associated portion of the corridor in <br /> more detail. <br /> The goal of this analysis was to determine the major origins and destinations of traffic using this segment of NC 54. <br /> In particular, what portion of traffic is passing through the corridor, which intersecting roads contribute the most <br /> traffic, and what traffic is using the NC 54 Bypass versus West Main Street?This analysis can help quantify and <br /> evaluate potential markets for alternative travel options, as well as validating forecast assumptions and confirming <br /> the Triangle Regional Model's accuracy in representing traffic patterns. <br /> It must be emphasized that in the following analyses, percentage drops in traffic refer only to the distribution of <br /> trips passing the defined reference point (indicated by the "100%" label).This does not indicate a reduction in total <br /> traffic (AADT) on NC 54. The exercise traces the destinations of vehicles captured at the reference point as we move <br /> east or west along the corridor away from the reference point. It indicates where these vehicles leave NC 54 and <br /> what portion remain on NC 54 at the end of the analyzed segment.This is not an analysis of traffic passing through <br /> the entire length of the corridor, nor of AADTs. <br /> Eastward Trip Distribution <br /> Figure 6 depicts the eastward distribution of daily vehicle-trips on NC 54 to/from a point just east of Orange Grove <br /> Road. Note that the"100%" label in the figure represents only traffic passing that point on NC 54, in both <br /> directions. This analysis traces the destinations of these trips along the corridor. For simplicity and clarity,we will <br /> discuss eastbound trips; westbound trips are the mirror image of these. The diagram indicates that 83%of these <br /> trips are still on NC 54 just west of Old Fayetteville Road. This 17% drop in volume works out to nearly 2,000 <br /> veh/day out of the original 2017 AADT of 11,000 veh/day east of Orange Grove Road. Most of the trips that have <br /> Page 3 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.