Orange County NC Website
4 <br /> 1. Receive the presentation, Draft NC 54 West Study Final Report and Phase 2 <br /> (Attachment 1); <br /> 2. Discuss as appropriate; and <br /> 3. Consider endorsing the DCHC MPO Technical Committee recommendation that the <br /> DCHC MPO Board receive the study, proceed with safety improvements along the <br /> corridor using information from the study, and that the local jurisdictions (including <br /> participation by TARPO) work together with DCHC MPO to identify future roadway <br /> improvements. <br />