Browse
Search
SWAG quick report 061312
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Solid Waste Advisory Group
>
Minutes
>
2012
>
SWAG quick report 061312
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2019 1:16:11 PM
Creation date
10/31/2019 1:16:10 PM
Metadata
Fields
Template:
BOCC
Date
6/13/2012
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Solid Waste Advisory Board <br />Regular Meeting <br />June 13, 2012 <br />Meeting Summary <br />Draft <br />3 <br /> <br /> a. Walnut Grove Road SWCC Construction Wilson: There were 4 bids which were <br />within budget. During the evaluation of the 2 low bids one of the vendors noticed <br />they made a $92,000 oversight in their bid for the base grade under the asphalt. <br />Taking that and some other factors into consideration we decided to rebid. There <br />will be no substantive changes to the bid. <br /> <br /> b. Single Stream Recycling Implementation Marshall: It is going to happen. <br />Dumpsters are getting repaired; signs and labels have been ordered. <br /> <br /> c. Landfill Neighborhood Clean Project Wilson: There is an RFP out to obtain a vendor <br />to do the work. Currently there are about 20 properties that have requested <br />cleanup and about 3 or 4 pending. With this small number it may not come close <br />to the amount budgeted and the cleanup may happen much quicker. <br /> <br /> d. Historic Rogers Road Task Force <br /> <br /> e. 56% Per Capita Waste Reduction in Latest State Report Pollock: Once again we’ve <br />achieved the highest waste reduction rate in North Carolina last fiscal year. <br /> <br /> f. New Household Hazardous Waste Contractor <br /> <br /> g. Future SWAB Meetings/Agenda Sassaman: Assume we will meet on August 8th <br />pending what we hear from the County manager. <br /> <br /> h. Other <br /> <br />7. Board Member Comments - None <br /> <br />8. Other Business – None <br /> <br /> Adjourn: 8:15pm <br />
The URL can be used to link to this page
Your browser does not support the video tag.