Browse
Search
Agenda - 04-03-2001-9b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 04-03-2001
>
Agenda - 04-03-2001-9b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:26:25 PM
Creation date
8/29/2008 10:30:27 AM
Metadata
Fields
Template:
BOCC
Date
4/3/2001
Document Type
Agenda
Agenda Item
9b
Document Relationships
Minutes - 04-03-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
RES-2001-037 Resolution to Approve for Special Use Permit, Class A for Planned Development of American Stone Company and Orange Water and Sewer Authority
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2001
RES-2001-038 Resolution to Approve an Ordinance for a Zoning Atlas Amendment for Planned Development of American Stone Company and Orange Water and Sewer Authority
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z <br />Information/Issues at Public Hearing on November 272000 <br />• Request far analysis regarding moving equipment into pit in 3.5 years rather than the 7 years <br />proposed <br />• Equipment relocation is constrained by the available area that has been mined, which is a <br />function of market demand far stone <br />• Special Use Permits do not have a mechanism to reflect market demand; the possibility <br />exists that a condition (timeframe) could be placed on the applicant that is neither feasible <br />nor economical <br />• Request of petitioner to define `demonstrable result' with regard to well repair <br />• Request of enforceability of requiring covered loads <br />• County Attorney is presently researching this issue and will present findings at BOCC <br />meeting - <br />• Analysis of bike lane requirement <br />• Staffs requested additional width (i.e. shoulders) along the new portion of Bethel Hickory <br />Grove Church Road. We called the additional width `bike lanes' because bikes usually use <br />them; however, the intent was not specifically bike lanes but additional shoulder width to <br />allow vehicles to pass (i.e. overtake) without moving into the opposing lane. <br />• Condition regarding `attempt to telephone adjacent owners prior to blasting' <br />• There is no specific ordinance that requires the applicant to do this. <br />• Condition of berm being high enough at 20 feet. <br />• Staff anticipates that with the landscaping that will be put in place on the berm--20 feet will <br />be adequate. <br />• Condition allowing residents to submit claims until 2030. <br />• Staff recommends that this condition be amended for allow for repairs up to three (3) years <br />after mining ceases. <br />Continuation_of_January 11.2001 Planning_Board Meeting,to, February 7.2001 <br />Request of for additional information on the following issues: <br />• Requested response from applicant regarding John Sutherland NCDENR letter <br />• Response by January 2fi, 2001 [Applicant provided response] <br />• Requested height and profile of existing berm along the northern property line of the site <br />• Applicant submitted detail drawings - <br />• Amended condition # 14 to allow residents to file for well reparations up to three years after <br />mining ceases <br />• Staff added wording in Condition # 14 <br />Requested clarification of condition # 23 to verify maximum charge delay is consistent with <br />previous Special Use Permit <br />• The maximum charge delay was not set in previous Special Use Permit. The delay was <br />set in the Mining Permit and has been offered as a condition in the new Special Use <br />Permit. <br />• Requested condition # 30 to be amended to require a report to be filed with the Planning <br />Department on an annual basis <br />• Staff amended condition # 30 to require annual submittal on corporate letterhead with <br />verification of accuracy <br />• Requested research regarding extension of water/sewer lines into the Rural Buffer in cases <br />where there exists a public health risk <br />• Provided information on the water/sewer boundary agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.