Browse
Search
2019-803-E AMS - Carolina Restoration Hillsborough Commons mitigation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-803-E AMS - Carolina Restoration Hillsborough Commons mitigation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2019 10:34:56 AM
Creation date
10/31/2019 10:28:17 AM
Metadata
Fields
Template:
Contract
Date
10/23/2019
Contract Starting Date
10/15/2019
Contract Ending Date
11/30/2019
Contract Document Type
Contract
Amount
$981.27
Document Relationships
R 2019-803 AMS - Carolina Restoration Hillsborough Commons mitigation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E35D47F7-0899-47E5-8268-C6A7EB19F198 <br /> Carolina Restoration Services of North Carolina,Inc. <br /> � <br /> 3401 Gateway Centre Blvd. <br /> *fAl <br /> Morrisville,NC.27560 <br /> 19-2523-COME <br /> Main Level <br /> Main Level <br /> DESCRIPTION QTY UNIT PRICE TOTAL <br /> I. Emergency service call-during business hours 1.00 EA @ 122.11= 122.11 <br /> 2. Equipment setup,take down,and monitoring(hourly charge) 4.00 HR cr 44.03= 176.12 <br /> 1 hour set up,2 hours monitoring, 1 hour take down <br /> Conference Room Height: 9' <br /> DESCRIPTION QTY UNIT PRICE TOTAL <br /> 3. Water extraction from carpeted floor 220.45 SF e@ 0.46= 101.41 <br /> 4. Remove Cove base molding-rubber or vinyl,4"high 7.00 LF rr 0.25 <br /> 5, Apply anti-microbial agent to part of the floor 220.45 SF rQt 0.20= 44.09 <br /> Equipment <br /> 6. Air mover(per 24 hour period)-No monitoring 12.00 EA et 25.62= 307.44 <br /> 4 air movers for 3 days <br /> 7. Dehumidifier(per 24 hour period)-Large-No monitoring 3.00 EA @ 75.95= 227.85 <br /> 1 large LGR dehumidifier for 3 days <br /> Grand Total Areas: <br /> 810.00 SF Walls 440.91 SF Ceiling 1,250.91 SF Walls and Ceiling <br /> 440.91 SF Floor 48.99 SY Flooring 90.00 LF Floor Perimeter <br /> 0.00 SF Long Wall 0.00 SF Short Wall 90.00 LF Ceil.Perimeter <br /> 440.91 Floor Area 471.35 Total Area 810.00 Interior Wall Area <br /> 926.67 Exterior Wall Area 92.67 Exterior Perimeter of <br /> Walls <br /> 0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length <br /> 0.00 Total Ridge Length 0.00 Total Hip Length <br /> 19-2523-COME 10/16/2019 Page:2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.