Browse
Search
2019-801-E Solid Waste - Crowder Gulf emergency storm debris
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-801-E Solid Waste - Crowder Gulf emergency storm debris
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2019 2:59:42 PM
Creation date
10/29/2019 11:44:52 AM
Metadata
Fields
Template:
Contract
Date
10/24/2019
Contract Starting Date
10/22/2019
Contract Ending Date
10/31/2022
Contract Document Type
Agreement - Services
Agenda Item
10/15/2019; 8-e
Document Relationships
Agenda 10-15-19 Item 8-e - Disaster Debris Removal and Clearance Service Agreement
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 10-15-19 Regular Meeting
R 2019-801 Solid Waste - Crowder Gulf emergency storm debris
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Disaster Debris Clearance and Removal Services <br />Bid: 5266, Orange County, North Carolina <br />July 29, 2019 Page 28 <br /> <br /> <br /> <br />Contractor is responsible for operating the DMS in accordance with Occupational Health and Safety <br />Administration (“OSHA”) guidelines. <br /> <br />L. Debris Site Tower Specifications <br />The Contractor shall provide one tower at each debris management site for the use of Local Government <br />representatives during their inspection of dumping operations. The inspection platform of the tower shall <br />be constructed at a minimum height of 10’ from surrounding grade to finish floor level, have a minimum <br />eight feet (8’) by eight feet (8’) of usable floor area, be covered by a roof with two feet (2’) overhangs on <br />all sides, and be provided with appropriate railings and a stairway. Platform shall be enclosed, starting <br />from platform floor level and extending up four feet (4’), on all four (4) sides. <br />The Contractor shall provide one portable toilet at each dumpsite for the use of Local Government <br />representatives during their inspection of dumping operations. The portable toilet shall be provided prior <br />to start of any dumping operations and kept in a sanitary condition by the Contractor throughout the <br />duration of dumping operations. <br />Care shall be taken to place the towers at a sufficient distance away from any reduction operations. If <br />necessary, dumping operations may be temporarily suspended by the Local Government Debris Manager <br />due to unsuitable conditions at the tower. <br /> <br />M. Grinding (Reduction of Storm Generated Debris) <br />Work shall consist of all labor, equipment, fuel, and miscellaneous costs necessary to reduce storm <br />generated debris by grinding. Reduction methods are at the discretion of the Local Government Debris <br />Manager. Grinding must be approved by the Local Government Debris Manager prior to commencement <br />of reduction activities. <br />All un-reduced storm debris must be staged separately at the DMS. <br />Contractor must obtain approval to reduce C&D debris from Local Government Debris Manager. If <br />approved for reduction by Local Government Debris Manager, C&D debris must be reduced via grinding in <br />order for the Local Government to compensate the Contractor for reduction. Incineration or mauling of <br />C&D is not an acceptable method of C&D reduction. <br /> <br />N. Incineration (Reduction of Storm Generated Debris) <br />Work shall consist of all labor, equipment, fuel, and miscellaneous costs necessary to reduce storm <br />generated debris by incineration. Reduction methods are at the discretion of the Local Government <br />Debris Manager. Incineration must be approved by the Local Government Debris Manager prior to <br />commencement of reduction activities. <br />All un-reduced storm debris must be staged separately at the DMS. <br /> <br />DocuSign Envelope ID: 5FA4B1AC-B897-4C32-A1E4-4B4A8885A341
The URL can be used to link to this page
Your browser does not support the video tag.