Orange County NC Website
DocuSign Envelope ID:5FA4B1AC-B897-4C32-A1E4-4B4A8885A341 <br /> Schedule 2--Hourly Equipment and Labor Price Schedule <br /> ** For services rendered during the first seventy (72) hours. **x* <br /> The first seventy(70)hours of service under this contract shall be for emergency road clearance only. <br /> The hourly equipment rate provided below shall include the cost of labor for the aperator. <br /> Hourly IIne items should be priced on one unit for one-hour operation. <br /> Equipment Type Hourly Equipment Rate <br /> Bobcat Loader $95.00 <br /> Bucket Truck w/Operator $145.00 <br /> Crane $165.00 <br /> Crash Truck wllmpact Attenuator $88.00 <br /> Dozer,Tracked,D5 or similar $135.00 <br /> Dozer,Tracked,D6 or similar $145.00 <br /> Dozer,Tracked,D7 or similar $150.00 <br /> Dozer,Tracked,D8 or similar $165.00 <br /> Dump Truck, 18 CY-20 CY $70.00 s <br /> Dump Truck,21 CY-30 CY $75.00 <br /> Generator and Lighting $30.00 <br /> Grader w112' Blade $140.00 <br /> Hydraulic Excavator, 1.5 CY $150.00 <br /> Hydraulic Excavator, 2,5 CY $165.00 <br /> Knuckleboom Loader $135.00 <br /> Lowboy Trailer wlTractor $120.00 <br /> Mobile Crane(Adequate for hanging limbs/leaning trees) $165.00 <br /> Pickup Truck, .5 Ton $10.00 <br /> Truck,Flatbed $70.00 <br /> Water Truck $80.00 <br /> Wheel Loader, 2.5 CY, 950 or similar $126.00 <br /> Wheel Loader, 3.5-4.0 CY, 966 or similar $138.00 <br /> Wheel Loader, 4.5 CY, 980 or similar $148.00 <br /> Wheel Loader-Backhoe, 1.0- 1.5 CY $105.00 <br /> Disaster Debris Clearance and Removal Services <br /> Bid: 5266,Orange County,North Carolina <br /> July 29, 2019 Page 36 <br />