Browse
Search
2019-801-E Solid Waste - Crowder Gulf emergency storm debris
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-801-E Solid Waste - Crowder Gulf emergency storm debris
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2019 2:59:42 PM
Creation date
10/29/2019 11:44:52 AM
Metadata
Fields
Template:
Contract
Date
10/24/2019
Contract Starting Date
10/22/2019
Contract Ending Date
10/31/2022
Contract Document Type
Agreement - Services
Agenda Item
10/15/2019; 8-e
Document Relationships
Agenda 10-15-19 Item 8-e - Disaster Debris Removal and Clearance Service Agreement
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 10-15-19 Regular Meeting
R 2019-801 Solid Waste - Crowder Gulf emergency storm debris
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:5FA4B1AC-B897-4C32-A1E4-4B4A8885A341 <br /> RDER (',G'ovid�'vG 11VROIF <br /> � f <br /> RFP for Disaster DebrisCiearance and Removal Services <br /> IF orange Caunty, NC <br /> 10. Drawings <br /> Inspection Towers <br /> At no cost to Orange County, CrowderGulf will construct a minimum of one inspection tower at each site adjacent to <br /> the roadway.A minimum of one exit lane for all trucks to use will be visible from a tower.This allows for checking truck <br /> beds before exiting,ensuring that they are completely empty.The inspection tower site location will provide a .25 mile <br /> approach outside the public road system to accommodate any truck back up. <br /> • All towers will be OSHA and FEMA compliant.At a minimum,the towers will be constructed with pressure treated <br /> wood with the floor elevation of the tower f 5'above the existing ground elevation;the floor area shall be 8'x 8', <br /> constructed of 2"x8"joists, f 6"O.C.with 3/a'plywood supported by four 6"x 8"posts. <br /> • The perimeter of the floor area will be protected by a 4'high wail constructed of 2"x 4"studs and%"plywood.The <br /> floor area will be covered by a corrugated tin roof, <br /> ■ The roof shall provide a minimum of 6'8"of headroom below the support beams. <br /> • Wooden steps will provide access with a handrail. In addition, the construction of towers will comply with all <br /> applicable County building codes. <br /> • Inspection towers shall be capable of seating a minimum of three inspectors each. <br /> ■ Towers will be removed at the completion of the project or when the site is no longer in need. <br /> Inspection Tower <br /> Cn r r.0 eated Ti!n w?ac,f <br /> c r Euraal. <br /> Hi ghet to Create <br /> ;❑pe r <br /> 'o <br /> !Y+.CJadStS <br /> R <br /> � o - <br /> V5 <br /> P.T.2*5 Cap t& <br /> Fo 4Xd <br /> x - <br /> �i o aR El rv>f Ciao <br /> Sa:asdtohr S;air5N 'Shown <br /> Rressws-Tres and <br /> k <br /> 4 <br /> 2 -�XIa col laFs�n• <br /> 041t511#t ar E7Jf6 F>OStS. ! 4.! � <br /> Frame 2X8 Joists eD 16' rn <br /> D.C.irato-COIarJoists � !' <br /> ors re _ <br /> I <br /> 2,XS C ra ss'Br a--es or, i <br /> Sides;w itFa u;Sta lr-s ' <br /> i <br /> r <br /> Set S X S Pot rts S' <br /> Into Ground <br /> (Optional i Existi n�i3 r ode <br /> 130 <br />
The URL can be used to link to this page
Your browser does not support the video tag.