Browse
Search
2019-801-E Solid Waste - Crowder Gulf emergency storm debris
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-801-E Solid Waste - Crowder Gulf emergency storm debris
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2019 2:59:42 PM
Creation date
10/29/2019 11:44:52 AM
Metadata
Fields
Template:
Contract
Date
10/24/2019
Contract Starting Date
10/22/2019
Contract Ending Date
10/31/2022
Contract Document Type
Agreement - Services
Agenda Item
10/15/2019; 8-e
Document Relationships
Agenda 10-15-19 Item 8-e - Disaster Debris Removal and Clearance Service Agreement
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 10-15-19 Regular Meeting
R 2019-801 Solid Waste - Crowder Gulf emergency storm debris
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:5FA4B1AC-B897-4C32-A1E4-4B4A8885A341 <br /> CRDINDEld e Ir'C,9 kW ff <br /> ISULF RFP for Disaster ❑ebrisClearance and Removal Services <br /> Orange County, NC <br /> After Hurricanes Isabel in 2003, and Ivan in 2004, CrowderGulf shipped clean vegetative chips to Italy to be used as <br /> bio-mass fuel. After Hurricanes Charley in 2004, and Irene in 2011, local power plants took chips for use as bio-mass <br /> fuel. In 2012, after Hurricane Isaac, Mississippi paper mills received all of our clean chips to use for bio-mass fuel. <br /> C&D Debris <br /> Concrete, asphalt and masonry products can be crushed and used as base material for certain road construction <br /> products or as a trench backfill. Debris targeted for base materials will need to meet certain size specifications as <br /> determined by the end user, The County may choose to recycle these products themselves. As an example, after <br /> Hurricane Ike, Galveston County recycled the crushed concrete(from home slabs on Bolivar Peninsula)by using it for <br /> road reconstruction and for a new government building foundation. <br /> Hurricanes and tornadoes can cause extensive damage to mobile homes,sun porches, and green houses. Most of the <br /> nonferrous and ferrous metal debris is suitable for recycling. Trailer frames, trailer parts, appliances and other metal <br /> items will be properly separated,crushed, baled and recycled. Any proceeds will be credited to Orange County. <br /> i <br /> Site Closure and Restoration <br /> Upon completion of debris reduction - -- - -- --- --- <br /> operations, all DMSs will be restored to pre- , <br /> existing conditions. All equipment, inspection <br /> towers, and any other temporary buildings will <br /> be removed. Burn pits will be returned to <br /> existing grade. Any unburned or chipped a <br /> materials will be hauled to an appropriate <br /> facility. Separated metals, plastics, white - - - -- <br /> goods or other materials and types will be <br /> disposed of as required by contract or <br /> regulations. Site reclamation I remediation will <br /> ,be billed back to the client at a pass through <br /> cost. In addition, if groundwater and / or soil <br /> testing is required,these items will be billed to �. <br /> the client at as pass through cost. A final site <br /> inspection will be conducted by County authorities and any discrepancies will be corrected. <br /> All work, including site restoration and closeout will be concluded within 30 calendar days of notice from the County <br /> that the last load of debris has been delivered. <br /> Documentation and <br /> Reimbursement Secure I'Veh Access <br /> CrowderGulf has been successful in the <br /> past In supporting our Clients with accurate <br /> Clients leff in to <br /> and complete documentation records. This secure I.Veb Access m <br /> documentation is readily available to the retrieve: - <br /> County, FEMA, FHWA and any other Reports <br /> agency that provides reimbursement. 4 TicketTrnages <br /> rFIC1 <br /> Superior record keeping using the best o Truck.Cerditcations <br /> available technology from the beginning to o Con€ractdocuments <br /> the end of the project is critical. Financial a other data as :.�" _ F. <br /> f <br /> accountability is maintained throughout the required <br /> process by using a system of checks and <br /> balances that are tied directly to the <br /> quantitative documentation originating In the _ <br /> field, `throughout the project, FEMA Public <br /> 112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.