Browse
Search
2019-801-E Solid Waste - Crowder Gulf emergency storm debris
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-801-E Solid Waste - Crowder Gulf emergency storm debris
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2019 2:59:42 PM
Creation date
10/29/2019 11:44:52 AM
Metadata
Fields
Template:
Contract
Date
10/24/2019
Contract Starting Date
10/22/2019
Contract Ending Date
10/31/2022
Contract Document Type
Agreement - Services
Agenda Item
10/15/2019; 8-e
Document Relationships
Agenda 10-15-19 Item 8-e - Disaster Debris Removal and Clearance Service Agreement
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 10-15-19 Regular Meeting
R 2019-801 Solid Waste - Crowder Gulf emergency storm debris
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:5FA4B1AC-B897-4C32-A1E4-4B4A8885A341 <br /> &ULF RFP for Disaster DetarisClearance and Removal Services <br /> Orange County, NC <br /> DEBRIS REDUCTION PLAN TIME LINE <br /> TASK TIME FRAME[from NTP <br /> Conduct requirements assessment of damaged area for DMS Within 24 hrs <br /> Develop DMS according to Management Plan, including rd construction, erosion controi, Within 48 hrs <br /> portable office&toilet facility <br /> Construct observation platform per FEMA requirements Within 48 hrs <br /> Construct grinding,burn pit,ash storage&hazardous waste storage areas Within 48 hrs <br /> Determine the number of burners&lot grinders/chippers required per site Within 48 hrs <br /> Ensure Hazardous Waste Plan in place Within 48 hrs <br /> If burning is permitted,begin construction of burn pits Within 48 hrs <br /> Complete installation of burners Within 72 hrs <br /> Secure permits&transport grinderslchi ers to designated reduction areas Within 72 hrs <br /> Set up grinders/chippers Within 72 hrs <br /> Maintain records of hours worked for operators,location worked,repairs,etc. Dail <br /> Ensure maintenance of burners&!or g(inderstchippers Dail <br /> Make dumpsite adjustments Dail <br /> Provide daily❑ erations reports to Project Manager&County Rep Dail <br /> Inspect DMS operations for safety&quality control monitoring Daily&periodically <br /> Handle storage&disposal of hazardous waste As required <br /> Restoration of site upon project completion to Count 's specifications Upon completion of project <br /> Provide for demobilization of equipment Upon completion of ail tasks <br /> Basic Debris Reduction Crews <br /> Personnel!Equipment Task Responsibility Number per <br /> Crew <br /> DMS Reduction Pro ect M r Supervise set up&daily o s of debris reduction site;Ensure all safety regulations enforced 11 Site <br /> Day Foreman Monitor incoming trucks,direct separation of materials;Supervise reduction crews;Monitor 11 Site <br /> For safety regulations being followed and report infractions to Foreman <br /> Night Forernanffbqrner Supervise crews&secure site;Monitor safety regulations&report infractions to Foreman 11 Site <br /> Spotters Monitor incoming debris types;Ensure drivers drop loads in proper locations at stockpiles; <br /> Direct clean loads of recyclable material to storage areas;Follow all safety requirements& 2-41 Site <br /> report any infractions to Foreman <br /> Flagmen Direct flow of incoming&outgoing trucks at site;Follow all safety requirements&report 2-4!Site <br /> any infractions to Foreman <br /> Laborers Separate recyclable materials from incoming debris&move it to designated storage areas; 2-4!Site <br /> Assist other workers with debris se oration <br /> Tower Monitor Check all ticket copies for legibility&accuracy;Alert monitor writing tickets of errors; 1!Site <br /> Monitor for safety infractions&report to Foreman <br /> Water Truck wlspray nozzles Spray nozzles used for dust control;High pressure for hose'for fire controi 1 site <br /> &high pressure hose <br /> Road Grader w/Operator Maintain rds&site 1 !site <br /> Onsite Fuel&Oil Storage Replenish equipment as needed 2-4!Site <br /> Tanks <br /> Track Hoe w/grapple Build burn pit according to Ops Manual;Clean ash from pits&pile in designated areas; 2 4 Site <br /> w10 erators Supply debris to burn it& tinder <br /> Bulldozer&for Rubber Tire Stockpile material;Push debris with Trackhoe 2-41 Site <br /> Loader w/Operator <br /> Burner Technician!Mechanic InitW burner set-up;Assist starting fires according to Ops Manual; Daily maintenance& 11 Site when <br /> care of burner&loader eg ui meat burnin <br /> 1000-1200hp Tub or Grind vegetative debris 11 Site when <br /> Horizontal Grinder grinding j <br /> Grinder Operator Fuel tub grinder&control grinder operation. 1!Grinder <br /> 110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.