Browse
Search
2019-801-E Solid Waste - Crowder Gulf emergency storm debris
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-801-E Solid Waste - Crowder Gulf emergency storm debris
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2019 2:59:42 PM
Creation date
10/29/2019 11:44:52 AM
Metadata
Fields
Template:
Contract
Date
10/24/2019
Contract Starting Date
10/22/2019
Contract Ending Date
10/31/2022
Contract Document Type
Agreement - Services
Agenda Item
10/15/2019; 8-e
Document Relationships
Agenda 10-15-19 Item 8-e - Disaster Debris Removal and Clearance Service Agreement
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 10-15-19 Regular Meeting
R 2019-801 Solid Waste - Crowder Gulf emergency storm debris
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:5FA4B1AC-B897-4C32-A1E4-4B4A8885A341 <br /> &UL F RFP for Disaster DebrisCfearance and Removal Services <br /> Orange County, NC <br /> Texas Tornados. In November of 2015,the City of Friendswood, TX experienced damages from a tornado that <br /> devastated several neighborhoods. CrowderGulf responded quickly to remove and dispose of the 8,700 cubic yards <br /> of debris. <br /> 2015 Storms Projects and Tasks <br /> 15 Total Clients Number of Clients in 2015 Storms Ut lizing Task <br /> ROW Debris Debris White Wet Sand/ Special <br /> Contract Amt Hauling Reduction Disposal Goods/ HHVV Debris beach Projects <br /> Ewaste Work <br /> $2,727,109 9 1 12 1 1 5 1 8 <br /> 2014 Storms <br /> Severe Flooding Event for the States of Alabama and Florida - Following 18-22 inches of rainfall in the States of <br /> Alabama and Florida coupled with tornados across the State of Alabama in April, CrowderGulf was activated by eight <br /> Alabama Contracts(Baldwin, Blount, DeKalb and Limestone Counties, and the Cities of Orange Beach, and Perdido <br /> Beach as well as the Alabama Department of Conservation and Natural Resources and Alabama Department of <br /> Transportation)and two Florida Contracts(Fscambia and Walton Counties). The debris services included emergency <br /> debris removal and reduction of over 280,000 cubic yards of debris. It also involved managing citizen drop sites, <br /> removing over 600 leaning trees and hanging limbs from over 1000 trees, removing over 150 hazardous stumps, <br /> clearing storm debris from beaches, providing pumping stations for flooded areas,and removing driftdebris from rivers. <br /> The total event utilized 10 subcontractors, 54 trucks including certified trailers (all averaging around 54 cubic yards <br /> capacity). Twelve tree crews and several more crews doing specialized tasks were used and all managed by <br /> CrowderGuff. <br /> Ice Storms Pax and Ulysses - These February, 2014 ice storms produced tr,ri <br /> primarily free damage. CrowderGulf had three pre-event contracts activated as <br /> a result of these storms. ' <br /> 4 r <br /> In both Berkeley County, SC, and Dorchester County, SC, CrowderGulf - <br /> performed ROW debris removal, reduction, and final disposal of vegetative r� <br /> debris. CrowderGulf was also tasked with the removal of leaning trees and <br /> hanging limbs in both South Carolina counties. flanging limbs were removed <br /> from over 30,000 trees from both counties and over277,000 cubic yards of vegetative debris removed.All work in both <br /> counties was completed in a little over two months. <br /> The third contract activated was Greensboro, NC, for debris removal. VVork was completed in Greensboro in <br /> approximately 45 days and 13,510 tons of debris removed. <br /> During these three projects, CrowderGulf managed 26 tree crews from 18 subcontractors to complete the work. Over <br /> 123 trucks were certified and hauled debris, including certified trailers (averaging approximately 67 cubic yards <br /> capacity). <br /> 2014 Storms Projects and Tasks <br /> 13 Total Clients Number of Clients in 2014 Storms Utilizing Task <br /> Contract Amt ROW Debris Debris Burn Grind L&H Stump Wet Sand/Beach Special <br /> Hauling Reduction Disposal Work Debris Work Projects <br /> $9,866,559 9 5 10 1 3 5 3 2 1 1 <br /> 76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.