Browse
Search
2019-801-E Solid Waste - Crowder Gulf emergency storm debris
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-801-E Solid Waste - Crowder Gulf emergency storm debris
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2019 2:59:42 PM
Creation date
10/29/2019 11:44:52 AM
Metadata
Fields
Template:
Contract
Date
10/24/2019
Contract Starting Date
10/22/2019
Contract Ending Date
10/31/2022
Contract Document Type
Agreement - Services
Agenda Item
10/15/2019; 8-e
Document Relationships
Agenda 10-15-19 Item 8-e - Disaster Debris Removal and Clearance Service Agreement
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 10-15-19 Regular Meeting
R 2019-801 Solid Waste - Crowder Gulf emergency storm debris
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:5FA4B1AC-B897-4C32-A1E4-4B4A8885A341 <br /> AMERBINDE <br /> LILULF RIFIP for Disaster DebrisClearance and Removal Services <br /> Orange County, NC <br /> ■ Safe and ready access of fire safety and rescue equipment will be provided to all functional sections of <br /> the site and to debris stockpiles <br /> ■ A Safety Zone of at least 200 feet will be established around the grinder <br /> • Air Curtain Incinerator(ACI) or Open burning safety zone will be established and will be 1,200 feet from <br /> any structure(other than inspection tower)and no less than 250 feet from any other pile or type of debris <br /> on site <br /> • Ash storage pit will be adjacent to ACI units <br /> ■ Compacted crushed rock and/or mulch will be used on ingresslogress road surfaces <br /> ■ Designated personnel parking area for 30 vehicles will be established <br /> ■ Space for two 12'x50'office trailers will be established <br /> • Development of a lined Hazardous Materials Containment Area surrounded by a berm <br /> • Two vegetative debris piles for grinding operations <br /> • Sufficient area for chip piles to minimize pile height to prevent spontaneous combustion <br /> • C&D debris area will be separate from other debris areas <br /> ■ Adequate area maintained at each site for truck maneuverability and a level stable surface for equipment <br /> to complete the dumping process <br /> ■ Site orientation will provide for ACI operations and grinding operations to be located downwind from <br /> offices and inspection towers{i.e., prevailing winds will be considered when setting up site) <br /> • If necessary, separate areas/sites for the public to use for dumping vegetative and C&D debris will be <br /> provided. Depending on the process prescribed for allowing this, a separate tower may be required to <br /> facilitate accounting for the material entering the public section. If off site citizen collection areas are <br /> developed in accordance with the Town's Debris Management Plan,CrowderGulf will remove debris from <br /> those sites on a regular basis as directed by the Town's Project Manager. <br /> DMS SITE PLAN <br /> A DMS Plan will be prepared to a scale of 1"=50'.The Task Order specific Management and Operations Plan will be <br /> updated to include the Site Management Plans for all DMSs and Disposal Sites operated by CrowderGulf. The DMS i <br /> Plan will display such functions as: <br /> • Access to the Site <br /> • Site Preparation—clearing, erosion control, and grading <br /> ■ Traffic Control <br /> ■ Site Security, Safety and Segregation of debris storage areas <br /> ■ Location of ash disposal area,hazardous material containment area,contractor work area,and inspection <br /> towers <br /> • Location of incineration operations and chipping operations <br /> • Location of existing structures or sensitive areas requiring protection <br /> • Household Hazardous Waste (HHW)or Hazardous, Toxic and Radioactive Waste(HTRW)storage <br /> ■ A detailed list of equipment <br /> ■ Sanitation facilities - - - <br /> The general site plan as shown below, will be `�° ® Errrirc�srr� =iaancaes <br /> IRh 41c P]pw¢l 1'055'C3' <br /> modified to fit the needs of each specific DM5 �015''"°"°" °"`°""�'�`�"' <br /> I`.k1ng!F onevk Rn4�,r P rU N s <br /> and will incorporate ail specifications addressed <br /> in the FEMA 325 and all local, state and federal <br /> tower <br /> regulations and requirements. <br /> env 5 <br /> Wgc4 lU a Aehrls '3 <br /> Hero t i <br /> r <br /> Aar L'urlxh[irchirrn[ors �� xro'Bxdur[w-/ <br /> 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.