Orange County NC Website
DocuSign Envelope ID: F55E53DA-6231-4A93-9BFA-2ADD5323B355 <br /> USUM 4-IT' <br /> DESIGN AND ENGINEERING SERVICES <br /> Task 3 — Permitting and Applications; <br /> We anticipate that the following permits will be required for this project and SUMMIT will <br /> prepare and submit the applications to be reviewed by each authority. The scope of this task <br /> also includes plan/application revisions as may be requested from each authority for minor <br /> changes to the plans and documents. Any major changes or requests will be done on a time- <br /> and-material basis according to the attached Schedule of Standard Rates: <br /> • Town of Hillsborough Zoning Compliance Permit <br /> o SUMMIT will prepare and submit the required ZCP permit application and <br /> supporting documents to the Town of Hillsborough Planning Department. <br /> Task 4 — Opinion of Probable Cost (OPC): <br /> Upon acceptance of the Final Concept Plan by the owner/client, SUMMIT will prepare an <br /> Engineer's Estimate/Opinion of Probable Cost (OPQ for the proposed development. This <br /> OPC will be based upon the best assumptions that can be made from the Concept Plan at <br /> that time. The OPC will be made with the best information available at the time for <br /> construction materials and labor costs. <br /> Task 5 — Hourly Services; <br /> Open task to address any additional miscellaneous services that may be required, additional <br /> meetings with the client or regulatory agencies or other items beyond the scope of work in <br /> Items 1-4. <br /> ASSUMPTIONS & EXCLUSIONS: <br /> • Additional services outside this scope of services will be provided if requested by the <br /> client for a negotiated lump sum fee or at our standard hourly billing rates under the <br /> provisions of Task 5. <br /> • This proposal is for the scope of work as specifically outlined in Tasks 1-4 above for the <br /> project design and permit approvals only. <br /> • This proposal is based upon receipt of a CAD file from the prior Engineering design firm <br /> for the project. (CAD file was received on 311212018) <br /> CLIENT RESPONSIBILITIES: <br /> It shall be the responsibility of the Client to provide the following items: <br /> 1. Access to the site. <br /> 2. Decisions on critical design issues as necessary in a timely manner. <br /> 3. Payment of all invoices per conditions of the agreement. <br /> 4. Client/Owner to be responsible for the payment of all regulatory agency fees for plan <br /> reviews and permitting, etc. <br />