Browse
Search
2019-797-E AMS - Summit Design contract amendment PFAP freezer installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-797-E AMS - Summit Design contract amendment PFAP freezer installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2019 12:08:52 PM
Creation date
10/29/2019 11:44:20 AM
Metadata
Fields
Template:
Contract
Date
10/31/2019
Contract Starting Date
8/20/2018
Contract Document Type
Contract Amendment
Amount
-$2,000.00
Document Relationships
2018-704-E AMS - Summit Design freezer installation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
R 2019-797 AMS - Summit Design contract amendment PFAP freezer installation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: F55E53DA-6231-4A93-9BFA-2ADD5323B355 <br /> [L-AL41T <br /> N AND ENGINEERING SERVICES <br /> For the Plot Plan Design the following deliverables are to be provided by SUMMIT with this <br /> scope: <br /> Deliverables: <br /> 1. Cover Sheet <br /> 2. Existing Conditions Plan sheet <br /> 3. Plot Plan Sheet <br /> 4. Site Details Sheet <br /> Task 1 B — Structural Engineering Services: <br /> For this project we propose providing the following structural engineering services: <br /> • Research pre-fabricated freezer system (in particular floor insulation systems) <br /> • Design a new structural retaining wall type foundation system for the proposed two <br /> side-by-side 15'-6" x 20' x 8' H exterior freezer boxes. <br /> • Provide structural plans and details suitable for permitting and construction of <br /> foundation system <br /> • Provide note form specifications on the drawings <br /> • Provide 2 site visits during construction, to review the footing reinforcement before <br /> concrete placement, and to review the wall reinforcement before concrete <br /> placement. <br /> Task 1 C — Electrical Engineering Services: <br /> For this project we propose providing the following electrical engineering services: <br /> • Provide an assessment of the load requirements for the proposed new side-by-side <br /> freezer installation, to determine if the existing freezer electrical service is <br /> sufficient. <br /> • Provide design for connection to existing service if practical, or a new design for <br /> service connection if needed. <br /> Task 2 — ZCP Review Process: <br /> SUMMIT will follow up with the Town of Hillsborough Planning Director and/or staff to obtain <br /> receipt of comments from the Technical Review Committee and other departmental staff. Upon <br /> receipt of the review letter and comments, SUMMIT will prepare one (1) set of revised plans <br /> and comment responses and submit back to the Town of Hillsborough for action. The scope of <br /> work for this Task will include attendance at one (1) TRC meeting. Any additional meetings or <br /> revisions required for subsequent review cycles will be done on a time-and-material basis <br /> according to the attached Schedule of Standard Rates. <br />
The URL can be used to link to this page
Your browser does not support the video tag.