Browse
Search
2019-797-E AMS - Summit Design contract amendment PFAP freezer installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-797-E AMS - Summit Design contract amendment PFAP freezer installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2019 12:08:52 PM
Creation date
10/29/2019 11:44:20 AM
Metadata
Fields
Template:
Contract
Date
10/31/2019
Contract Starting Date
8/20/2018
Contract Document Type
Contract Amendment
Amount
-$2,000.00
Document Relationships
2018-704-E AMS - Summit Design freezer installation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
R 2019-797 AMS - Summit Design contract amendment PFAP freezer installation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: F55E53DA-6231-4A93-9BFA-2ADD5323B355 <br /> GSUHtAT 919.732.3883 SUMMIT-ENGINEER.COM <br /> DESIGN AND ENGINEERING SERVICES 504 Meadowland Drive, Hillsborough,NC 27278 <br /> March 16, 2018 (EXHIBIT A) <br /> Revised: 719118; 7112118 <br /> Piedmont Food & Ag Processing Center <br /> Attn: Eric Hallman <br /> 500 Valley Forge Road <br /> Hillsborough, NC 27278 <br /> Re: Piedmont Food & Ag — Freezer Addition <br /> Orange County Tax Parcel PIN 9874315787 <br /> Dear Mr. Hallman: <br /> SUMMIT is pleased with the opportunity to provide this scope and fee proposal for consulting <br /> services for the proposed improvements and new construction at the Piedmont Food & Ag <br /> Processing Center on Valley Forge Rd. in Hillsborough, NC. It is our understanding that you are <br /> proposing to add a Freezer facility on the east side of the existing building. It is also our <br /> understanding that to obtain approval from the Town of Hillsborough for this work that a Zoning <br /> Compliance Permit will need to be submitted, reviewed and approved by the Town. We propose <br /> to provide the nessesary site Civil and Structural Engineering design drawings and details for <br /> these improvements and our proposed full Scope of Work for this project is outlined in the <br /> following sections of our proposal. We look forward to working with you to help meet the needs <br /> and goals of your business. <br /> , <br /> ti <br /> SCOPE OF WORK <br /> Task IA — Zoning Compliance Permit (ZCP) Site Plan Design Drawings; <br /> For the proposed site modification to add the Nitrogen Tank and Freezer expansion SUMMIT <br /> will prepare a Plot Plan design drawing in accordance with the requirements of Appendix G <br /> of the Town of Hillsborough UDO. This drawing will be included with the ZCP application <br /> submittal package as outlined under Task 3 (Permitting and Applications) below. The Plot <br /> Plan drawing will include the items as noted under the provisions of Appendix G including <br /> property lines and dimensions, existing and proposed structures, offset dimensions of the <br /> structures to the property line, streams, creeks and ponds and all other site improvements <br /> on the property. (Sidewalks, Drives, Parking, etc.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.