2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2019 2:50:04 PM
Creation date
10/24/2019 11:31:33 AM
Metadata
Fields
Template:
Contract
Date
10/14/2019
Contract Starting Date
3/20/2019
Contract Ending Date
2/14/2020
Contract Document Type
Contract Amendment
Amount
$312,075.50
Document Relationships
2019-193-E AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2019-778 AMS - Sasser Companies Inc ES remediation amendment 3
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 12/18 <br /> <br />ORANGE COUNTY <br /> CHANGE ORDER REQUE <br />NORTH CAROLINA <br /> <br />___________________________________________________________________________________________________ <br />Date: 10/14/2019 Project: Phillip Nick Waters Emergency Services Building - Roof, Lights, Plumbing <br />No. 03 Department: AMS Department Address: 131 W. Margaret Lane, HIllsborough, NC 27278 Project: Em <br />Services Remediation Contractor: Sasser Companies, Inc Contractor Address: PO Box 10, Whittsett, NC 27 <br /> Effective date of original contract: 3/20/2019 <br /> <br />This change order increases decreases the contract time by 56 days. Check here if no impact to contract time . <br /> <br />Will this change order impact the date of substantial completion? Yes No. If yes, the amended date of subs <br />completion is: February 14, 2020 <br />___________________________________________________________________________________________________ <br /> <br />Full Description of Change: This change request includes the following: <br />2nd Floor layout changes required to meet code including demolition, framing, drywall, painting, mechanical, electrical an <br />changes. Roof Replacement generally described as a re-roof of the existing facility, including alternate to use (2) layers of <br />insulation. Plumbing repairs to lines and fixtures found once drywall was removed, including damages to lines with holes, <br />screw holes, and venting for lines not vented all all and accepting alternater for new shower valve to replace unit downst <br />life, and replacement of all light fixtures with LED lights. <br /> <br />Reason for Change: During the demolition it was discovered wooden studs within the walls that are no longer allowed by <br />therefore the wall changes are being made to bring the existing interior walls up to code. This requires additional mechan <br />and fire alarm work that was not planned within the original scope of work since the interior walls were not being remove <br />being replaced due to during construction it was determined that the roof was in a more deteriorated state than previou <br />the roof work started this uncovered other problems. This re-roof will install a new roofing system over the existing roofi <br />which will also increase the insulation value, more energy savings and also noise reduction for the call center. The plumbi <br />required due to finding multiple drain lines and vents with puncture holes from screws used for the original installation o <br />and one vent was not vented outside or tied into an existing system, it was vented directly into the ceiling cavity. This ven <br />the exterior of the building. The shower valve within the shower room is at end of life and to ensure no leaking in the futu <br />replaced at this time. The LED light fixtures are to replace the existing light fixtures. This will support the BOCC goals for e <br />and allows the total number of fixtures to be reduced compared to the number of fixtures originally installed. <br />___________________________________________________________________________________________________ <br /> <br />Original contract sum: $ 1,499,409.00 <br /> <br />Contract sum prior to this change order: $ 1,984,524.48 <br /> <br />Amount of this change order: $ 312,075.50 <br /> <br />Total sum of the contract including this change order: $ 2,296,599.98 <br /> <br />___________________________________________________________________________________________________ <br />This change order is executed to amend the contract time and/or contract sum. It shall not be construed to impact the o <br />project, services, or work in any other manner. <br />DocuSign Envelope ID: 78A44749-59C0-4606-ACA0-54BC14EA1EF1