Orange County NC Website
DocuSign Envelope ID:A18808EO-5F70-4494-BCOC-49B95D82162D <br /> LifeLineMnbile@ <br /> Progress Chart <br /> START • DAY 1 <br /> ' Final floor plan approved. Contract signed& <br /> • down payment received. <br /> CELLSOrdering of cab-chassis, clinic Insulation, rough <br /> body raw materials, and CELL electrical, HVAC& <br /> 1 Q 2 specialized equipment required. 3 plumbing,finish floor, <br /> �7[ Clinic body construction begins. wall system <br /> DAY 116 • DAY 95 25% <br /> housings,CELL Undercarriage Ceiling <br /> hydraulics, . • •• lighting• IBegin graphic design <br /> I - MM <br /> DAY 131 • DAY 145 <br /> CaseworkCELL 'WL L <br /> •. •. equipment <br /> installed,electrical - <br /> mAGraphics6 completed undercarriage plumbing completed I <br /> by Day 150 <br /> • <br /> DAY 170 DAY 158 15% <br /> DAY 183 dO DAY 197 <br /> FINISHING Final systems checks, quality assurance <br /> inspections, and vehicle test run. Delivery DAY 210 <br /> AREAscheduled for initial owner training. <br />