Browse
Search
2019-777-E Health - LifeLine mobile dental unit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-777-E Health - LifeLine mobile dental unit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2019 2:44:50 PM
Creation date
10/24/2019 11:30:22 AM
Metadata
Fields
Template:
Contract
Date
10/17/2019
Contract Starting Date
10/17/2019
Contract Ending Date
10/16/2020
Contract Document Type
Agreement - Services
Agenda Item
10/15/2019; 8-c
Amount
$445,748.00
Document Relationships
Agenda 10-15-19 Item 8-c - Health Department Mobile Dental Clinic Contract
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 10-15-19 Regular Meeting
R 2019-777 Health - LifeLine mobile dental unit
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A18808EO-5F70-4494-BCOC-49B95D82162D <br /> LifeLineMnbile@ <br /> Progress Chart <br /> START • DAY 1 <br /> ' Final floor plan approved. Contract signed& <br /> • down payment received. <br /> CELLSOrdering of cab-chassis, clinic Insulation, rough <br /> body raw materials, and CELL electrical, HVAC& <br /> 1 Q 2 specialized equipment required. 3 plumbing,finish floor, <br /> �7[ Clinic body construction begins. wall system <br /> DAY 116 • DAY 95 25% <br /> housings,CELL Undercarriage Ceiling <br /> hydraulics, . • •• lighting• IBegin graphic design <br /> I - MM <br /> DAY 131 • DAY 145 <br /> CaseworkCELL 'WL L <br /> •. •. equipment <br /> installed,electrical - <br /> mAGraphics6 completed undercarriage plumbing completed I <br /> by Day 150 <br /> • <br /> DAY 170 DAY 158 15% <br /> DAY 183 dO DAY 197 <br /> FINISHING Final systems checks, quality assurance <br /> inspections, and vehicle test run. Delivery DAY 210 <br /> AREAscheduled for initial owner training. <br />
The URL can be used to link to this page
Your browser does not support the video tag.