Orange County NC Website
DocuSign Envelope ID:A18808EO-5F70-4494-BCOC-49B95D82162D <br /> Plumbing 55 gallon fresh @nd waste See Specifications <br /> Safety Equipment DOT safety kit, tear cabin xtinguis er, <br /> 2 smoke detectors <br /> Walls See Specificatio is <br /> Wheelchair (underbody) Undercarriage. Meets ADA. requireiients. <br /> 700 lb. capacity <br /> Windows 6 rear cabin tinted windows including two <br /> emergency exit windows on streetside. <br /> Technology to include (describe each): <br /> Internet connection CAT6 wiring throughout vehicle. Monthly air card <br /> Cellular broadband router for subscription <br /> Wi-Fi Capability broadband communicatioi and required cards <br /> wifi capability. minimum <br /> Computer Hardware and Software Computer hardware, software, and peripherals <br /> provided by ow tier. Allowance can be provided on <br /> request. <br /> 3. Plan Schematics (above and side views): <br /> a. Insert or attach the plan schematics for the vehicle. <br /> See included files <br /> 4. Training and Ongoing Support: <br /> a. Describe your approach to user training and ongoing support (to include <br /> both vehicle and equipment training and support.) <br /> See cover letter and specifications <br /> 5. Annual maintenance requirements: <br /> a. Describe the annual maintenance requirements for the vehicle and <br /> projected costs if applicable. <br /> b. Describe any annual and emergency maintenance your company is able <br /> to provide for the vehicle. Please include if your technicians are bonded. <br /> c. List and describe all warranty and extended warranty options for the <br /> vehicle.See files, "Expedted useful life", "Service Locations", and "Secure warranties <br /> and details". Freighliner emergency roadside assistance is available. <br /> 6. Environmentally Sustainable Materials: <br /> a. Describe the environmentally sustainable materials used in the <br /> construction and operations of the vehicle. <br /> See file entitled, "14 ways to help out our planet. <br /> 7. Cost: <br /> a. A cost proposal based upon a maximum fee broken down as listed below: <br /> i. Total Cost of Unit $ 424,623.00 <br /> 7 Page <br />