Orange County NC Website
DocuSign Envelope ID:791B8A8D-56E7-46E8-9C1E-E15DF599B542 <br /> REMOUNT PRICING <br /> Version 18.3 <br /> 2455 <br /> 2459 <br /> 2460 HVAC SYSTEMS: <br /> 2463 TYPE I CHASSIS Ford or Dodae <br /> 2471 115/12 Dual Volt HVAC systems: <br /> Dual voltage heavy duty combination heater/air conditioner system with digital electronic thermostat with digital <br /> temperature display. WITH dual compressors(One 12VDC OEM chassis compressor and one 115VAC auxiliary <br /> 2472 ( 1 )compressor)AND 0.00 0.00 <br /> 2473 ( 1 )'12VDC and 115VAc auxiliary A/C condensors mounted Under the module body. 6,352.93 6,352.93 <br /> 2481 <br /> 2533 Temperature Control Options 0.00 0.00 <br /> 2548 ( 1 )Replace the existing air return filtered grill with a new grille and filter. 135.91 135.91 <br /> 2568 CUSTOMER NOTES AND SPECIAL REQUESTS <br /> Ref.Line#2473:In lieu of the standard#105 condenser,install a 2-fan flat mount condenser,Pro Air#109 Part Number <br /> #50-001-601,under the L4 compartment for the Dual HVAC system.Install the control box for the dual volt HVAC <br /> 2569 system on the upper back wall of the HVAC cabinet over the AILS cabinet. 0.00 <br /> 2570 <br /> Ref.Line#2473:Fabricate and install(2)bare aluminum brackets around the underbody condenser to further secure <br /> 2571 and protect the condenser. 228.18 <br /> 2572 <br /> 2576 <br /> 2613 CONTINGENY ALLOWANCE(PORTION NOT USED WILL BE DEDUCTED FROM THE FINAL INVOICE). ENTER PRICE <br /> —Contingency allowance,which shall be used to replace D-ring handles,door latches,etc.that may be found during the <br /> 2614 remount process. 2,000.00 2,000.00 <br /> 2637 <br /> 2638 <br /> 2639 ADDITIONAL TERMS AND CONDITIONS FOR THIS CONTRACT <br /> 2640 PAYMENT TERMS ARE COD/FOB EXCELLANCE,INC.MADISON,AL. <br /> 2641 The effective date of this contract is the day this order is accepted by Excellance as <br /> 2642 evidenced by the date this contract is executed by an officer of Excellance. <br /> 2643 <br /> 2644 Construction will begin only after all questions have been resolved. Once the unit is in production, <br /> 2645 changes will result in an engineering fee of$250 in addition to the price for the change. <br /> 2646 <br /> 2647 Failure to select an option on this order form will result in:(i)no charge to the customer, <br /> 2648 (ii)no obligation by Excellance for that item,and(iii)the possibility of a$250 charge for <br /> 2649 changes or additions that occur after production begins on a vehicle. To select any option <br /> 2650 you must either:(a)enter "1" in the "( )", OR (b)enter a specific number in the <br /> 2651 when instructed to do so. <br /> 2652 <br /> 2653 Review this order carefully. Changes,alterations or additional work ordered shall be charged <br /> 2654 for at current rates with additional time being allowed Excellance for delivery. <br /> 2655 <br /> 2656 Price is exclusive of taxes,licenses,etc.which shall be the responsibility of purchaser. <br /> Rev:062818 14 of 17 1/8/2019 9:27 AM <br />