Browse
Search
Agenda - 04-03-2001-10b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 04-03-2001
>
Agenda - 04-03-2001-10b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:28:07 PM
Creation date
8/29/2008 10:30:16 AM
Metadata
Fields
Template:
BOCC
Date
4/3/2001
Document Type
Agenda
Agenda Item
10b
Document Relationships
Minutes - 04-03-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~11/~lSA ORANGE WATER S~ SEWER ALXTH~RTTY <br />t2uality Service Since 1977 <br />December 29, 2000 <br />Mr. John Morris, Duector <br />NC Division of Water Resources <br />1611 Mail Service Center <br />Raleigh, NC 27699-1611 <br />Dear Mr. Morris: <br />I am pleased to submit this draft application for a Jordan Lake water supply allocation on behalf <br />of the Orange Water and Sewer Authority (OWASA ). We believe the information contained <br />herein supports our preliminary request to reduce our existing 10 million gallon per day (IvIGD) <br />Level II allocation to 5 MGD. <br />OWASA has invested substantial resources ~in our Jordan Lake option since 1988. These have <br />included $149,000 in fees for the 10 MGD Level II allocation; $550,000 in the early 1990s for <br />125 acres of land adjacent to Corps of Engineers property on the western side ofJordan Lake; <br />$25,000 for an intake siting study in 1991; and $60,000 in construction costs for pipe casings <br />placed under U.S: Highway 64. It is obvious that our longstanding interest in Jordan Lake is <br />more than casual, and it goes without saying that OWASA is.committed to meeting any and all <br />financial obligations associated with a Jordan Lake allocation. <br />Historically, our allocation.has represented a supply that could supplement existing sources when <br />their yield na longer meets the growing needs of the community we serve. More recently, <br />OWASA's Comprehensive Water and Sewer Master Plan and its March, 2000 Water Supply SO- <br />Year Vision paper identified the extended (3 billion gallon) Stone Quarry Reservoir as the best <br />choice for the next increment of water supply expansion. This option has been strongly endorsed <br />by our Board of Directors and the community. <br />Due to the extended time needed to increase the volume of the existing quarry through <br />commercial rock exhactian, as well as contractual commitments between 4WASA and <br />American Starve Company (our commercial quarrying partner), the expanded quarry is not <br />expected to be available for use as a storage reservoir unti1203S. The supply and demand <br />analysis presented in the attached draft application indicates a.likely deficit of up to several <br />million gallons per day between 2020 and.2035. We propose using our Jordan Lake allocation <br />as a temporary supplement to offset that deficit until the expanded Quarry Reservoir can be <br />placed in service in or about 2035. <br />It is not known at this time if OWASA's use of its allocation will be in partnership through a <br />regional enterprise, or more simply through along-term finished water purchase/sale contract <br />with the City of Durham and/or Chatham County. <br />400 Jones Ferry Road Equal Opportunit-• Employer 1/oice (919) 968-4421 <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.