Orange County NC Website
- 2 - March 26, 2001 3 <br />Transportation. It is interesting to Hate that the Town of Carrboro requires that <br />applicants reimburse the Tawn for 8p percent of its engineering services, and this <br />cost is included in the Smith Middle School project. For East Chapel Hill High <br />School, the Town of Chapel Hill required CHCCS to increase the number of <br />parking spaces in order to accommodate potential overflow from a Town park <br />located across the street. In addition, the school system was required to <br />construct a pedestrian walkway located on property adjacent to the high school. <br />While the school district did incur additional costs for these items, staff was not <br />able to identify the specific costs of these additions. Other examples required <br />during construction of new schools in both systems include installation of <br />sprinkler systems, removal of site clearing debris (instead of burning), and <br />installation of storm water management systems. <br />Feel free to contact me if you have additional comments or questions. <br />