Schedule F 47 <br /> ineMobiler <br /> Progress Chart <br /> START • DAY 1 <br /> ' Final floor plan approved. Contract signed& <br /> • down payment received. <br /> CELLSOrdering of cab-chassis, clinic Insulation, rough <br /> body raw materials, and CELL electrical, HVAC & <br /> 1 & 2 specialized equipment required. 3 plumbing,finish floor, <br /> �7[ Clinic body construction begins. wall system <br /> DAY 116 • DAY 95 25% <br /> windows,ZT- CELL Undercarriage housings, CELL Ceiling structure, <br /> hydraulics,generator <br /> -5 installations 4 Begin graphic design <br /> I - MM <br /> DAY 131 • DAY 145 <br /> CELLinstalled,electrical work installation,systems testing, <br /> Casework and windows Iff L Specialized equipment <br /> completed undercarriage plumbing completed I <br /> Graphics final by Day 150 <br /> DAY 170 DAY 158 15% <br /> DAY 183 • DAY 197 <br /> FINISHING Final systems checks, quality assurance <br /> inspections, and vehicle test run. Delivery DAY 210 <br /> AREAscheduled for initial owner training. <br />