Browse
Search
Agenda - 03-29-2001-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 03-29-2001
>
Agenda - 03-29-2001-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:14:29 PM
Creation date
8/29/2008 10:30:05 AM
Metadata
Fields
Template:
BOCC
Date
3/29/2001
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 03-29-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />ESTIMATED PRQJECT TIlVIE LINE <br />^ BOCC approvals initiation of process to construct the Efland Sewer <br />Bond Referendum defined portion of the sewer system <br />Send out Request for Proposals (RFP) for consulting engineers for <br />design of Efland Sewer Bond Referendum defined portion of the sewer <br />system <br />^ Select engineering consultant, develop contracts, submit consultant <br />contract to BOCC for approval <br />Time 0 <br />Time 0 + Z weeks <br />Time 0 + 14 weeks <br />~ ~-Complete engineering design; secure necessarydesign approvals and - - Time-0 + 10 months <br />,.. _ ._,-.._~anstruction-permits, identify easements need for BOCC-approved - _ - _ ...~: . <br />bond and assessment project <br />^ Complete engineer's report, environmental assessment, all other Time 0 + 10 months <br />documents necessary to submit Clean Water Grant and revolving loan . <br />fund applications (this step may not be necessary or practicable, <br />depending on decisions about seeking grant funding and grant funding <br />deadlines) <br />^ Complete easement acquisition, solicit and award construction bids, Time 0 + 13 months <br />begin construction <br />^ Complete system construction Time 0 + ZS months <br />^ Complete development and begin implementing BOCC-approved sewer Time 0 + ZS months <br />use rate structwre and sewer assessment process. <br />., . <br />