Browse
Search
Agenda - 03-29-2001-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 03-29-2001
>
Agenda - 03-29-2001-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:14:29 PM
Creation date
8/29/2008 10:30:05 AM
Metadata
Fields
Template:
BOCC
Date
3/29/2001
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 03-29-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />Expanding sewer service to the area defined in the 1997 bond will make sewer service available to all <br />but 10 individuals who sighed up for sewer service during the initial drive to solicit customers in 1985. <br />Six of those individuals are located along US 70 beyond the western reach of the existing system. The <br />remaining four customers aze located along US 70 beyond eastern reach of the gravity collectar system <br />that would be constructed as the bond project. The properties of two ofthese customers lie outside of <br />the Transition Area and in the Eno River watershed critical area. There aze several more potential <br />customers (those who did not sign for sewer service in 1985) along US 70, Gym Road and Lloyd Dairy <br />Raad who aze also beyond the eastern reach of the proposed bond financed collector system and who are <br />also in within the Eno River/Seven Mile Creek watershed critical areas. <br />Extending sewer service to those few potential customers (existing residents/homes) beyond the eastern <br />end of the bond referendum defined service area will involve penetrating the watershed critical areas as <br />currently defined and would probably be accomplished by one of two potential sewer design strategies: <br />_ _at~llite gravity/pump station system subs stem consisting of <br />_. .. a s y <br />- ~ .*:_,.~.siaagle pumping st_?*ion located At or-near the US 70 Eno River Grossing <br />^ collector lines draining the pumping station <br />^ a farce main routed from the pump station back to the central gravity collectar system; or <br />2) a satellite STEP-type subsystem consisting of; <br />^ small low pressure force main collectors discharging to the central gravity collector system <br />^ low capacity pumping stations located on-site for each customer <br />Efland Sewer Bond Proiect Issues/Concerns <br />Although the Efland Sewer Bond was passed in November 1997, the sewer expansion process <br />(consultant selection, surveying, identification or acquisition of easements, preparation of construction <br />documents, permitting, etc.) has not yet been initiated This delay has occurred as a consequence ofthe <br />close association between expansion of the Efland sewer system as a whole and a number of unresolved <br />and interrelated issues associated with the development and evolution of the Efland-Cheeks community. <br />These issues, which have been enumerated and incorporated in the Efland Sewer Goal since 199.8 and <br />are currently being addressed by the BOCC and staff, include: ~ .. . <br />^ joint planning process with Mebane <br />^ Efland orEfland-Cheeks small area plan <br />^ Orange Alamance water shortage situation <br />^ developing the Buckhorn Road EDD and its utility services <br />^ Efland-Cheeks sewer master plan/utility service district/ Transition Area(s) <br />Another issue, albeit one that is not plainly explicated in the BOCC's current Efland Goal, is that bond <br />financing could play a role in securing funding for additional sewer expansion beyond the bond-defined <br />area. Specifically, it may be possible to use bond funds to leverage grant funds that could then be used <br />to pay some portion of the costs of expanding the sewer system to other azeas of the Efland-Cheeks <br />community. As the County's plan for the ultimate configuration of the Efland sewer system has not yet <br />been defined, the potential for grant financing of sewer expansion interjects yet another element of <br />uncertainty. However, resolution of all of these issues and concerns not withstanding, it is possible that <br />the process of expanding the sewer system to the bond-defined azea could commence this spring. <br />
The URL can be used to link to this page
Your browser does not support the video tag.