DocuSign Envelope ID: 1 C70F9FE-526C-4CE4-94BA-7079005l l B9B
<br /> Proposal No.: 06:21628 (hereinafter the"Proposal')
<br /> L ECS SOUTHEAST, LLP
<br /> rrrrrE TERMS AND CONDITIONS OF SERVICE
<br /> The professional servlres('Services")to be provided by ECS SOUTHEAST,LLP("ECS") 7.2 CLIENT warrants that It possesses all necessary permits, licenses andlor utility
<br /> pursuant to the Proposal shall be provided In accordance with these Terms and Conditions clearances for the Services to be provided by ECS except where ECS'Proposal
<br /> of Service("Terms'),Including any addenda as may be Incorporated or referenced in wrlling expliciIly states that ECS will obtain such permits,licenses,and/or utility clearances.
<br /> and shall form the Agreement between ECS and CLIENT. 7.3 ECS will lake reasonable precautions to limit damage to the Site and its
<br /> 1.0 INDEPENDENT CONSULTANT STATUS -ECS shall serve as an independent Improvements during the performance orb Services. CLIENT understands that the
<br /> professional consultant to CLIENT for Services on the Project and shall have control over, use of exploration,boring,sampling,or testing equipment may cause damage to the
<br /> and responsibillty for,the means and methods for providing the Services identified In the Site. The correction and restoration of such common damage is CLIENT'S
<br /> Proposal,including the retention of Subcontractors and Subconsullants responsibility unless specifically included In ECS'proposal.
<br /> 7A CLIENT agrees that it will not bring any claims for liability or for injury or lass against
<br /> 2.0 SCOPE OF SERVICES-It is understood that the Teas,reimbursable expenses ECS arising from(1)procedures associated with the exploration,sampling or testing
<br /> and time schedule defined In the Proposal are based on Information provided by CLIENT activities at the Site,ply discovery of Hazardous Materials or suspected Hazardous
<br /> andlor CLIENT'S, agents, contractors and consultants ('Contractors"). CLIENT Materials, or(iii) ECS' findings, conclusions, opinions, recommendations, plans,
<br /> acknowledges that if this information is not currem,Is incomplete or Inaccurate,if conditions andlor specifications related to discovery of contamination.
<br /> are discovered that could not be reasonably Foreseen, or if CLIENT orders additional
<br /> services,the scope of services will change,even while the Services are In progress. 0.0 UNDERGROUND UTILITIES
<br /> 3,0 STANDARD OF CARE 8.1 ECS shall exercise the Standard of Care in evaluating client-fumished informalion
<br /> as well as information readily and customarily available from public utility Iocaling
<br /> 3.1 In fulfilling its obligations and responsibilities enumerated in the Proposal, services(the"Underground Uliiity Information")In Its effort to Identify underground
<br /> ECS shall be expected to comply with and its performance evaluated in light ufilitles.The extent of such evaluations shall be at ECS'sole discretion.
<br /> of the standard of care expected of professionals In the industry performing 8.2 CLIENT recognizes that the Underground Utility information provided to or obtained
<br /> similar services on projects of like size and complexity at that time in the by ECS may contain errors or be incomplete.CLIENT understands that ECS may
<br /> region (the "Standard of Care"). Nothing contained in the Proposal, the be unable to Identify the locations of all subsurface utility lines and man-made
<br /> agreed-upon scope of Services,these Terms or any ECS report,opinion,plan features.
<br /> or other document prepared by ECS shall constitute a warranty or guarantee
<br /> of any nature whatsoever. 8.3 CLIENT waives, releases, and discharges ECS from and against any claim for
<br /> 3,$ CLIENT understands and agrees that ECS will rely on the faces teamed from data damage,injury or loss allegedly arising from or related to subterranean structures
<br /> (pipes,tanks,cables,or other utilities,etc.)which are not called to ECS'attention in
<br /> gathered during performance of Services as well as those facts provided by the writing by CLIENT, not correctly shown on the Underground Utility Information
<br /> CLIENT andlor CLIENT'S contractors and consultants. CLIENT acknowledges that andlor not properly marked or located by the utility owners,governmental or quasi-
<br /> such data collection is limited to specific areas that are sampled, bored, tested, governmental locators,or private utility Iocating services as a result of ECS'or ECS'
<br /> observed and/or evaluated. Consequently. CLIENT walves any and all claims Subconsultanl's request for utility marking services made in accordance with local
<br /> based upon erroneous facts provided by the CLIENT,feats subsequently learned or industry standards.
<br /> regarding conditions in areas not specifically sampled,bored,tested,observed or
<br /> evaluated by ECS. 9.0 SAMPLES
<br /> 3.3 if a situation arises that causes ECS to believe compliance with CLIENT'S directives 9.1 Soil,rock,water,building maledals andlor other samples and sampling by-products
<br /> would be contrary to sound engineering practices,would violate applicable laws, obtained from the Site are and remain the property of CLIENT. Unless other,
<br /> regulations or codes,or will expose ECS to legal claims or charges.ECS shall so arrangements are requested by CLIENT and mutually agreed upon by ECS in
<br /> advise CLIENT. If ECS'professional Judgment is rejected.ECS shall have the right writing,ECS will retain samples not consumed In laboratory testing for up to sixty
<br /> to terminate its Services in accordance wlth the provisions of Section 25.0.below. (60)calendar days after the first issuance of any document centalNng data obtained
<br /> 3.4 If CLIENT decides to disregard ECS'recommendations with respect to complying from such samples.Samples consumed by laboratory testing procedures will not be
<br /> with applicable laws or regulations.ECS shall determine if applicable law requires stored.
<br /> ECS to notify the appropriate public officials. CLIENT agrees that such 9.2 Unless CLIENT directs otherwise,and excluding those issues covered In Section
<br /> determinations are ECS'sole right to make. 10.0.CLIENT authorizes ECS to dispose of CLIENT'S non-hazardous samples and
<br /> 4.0 CLIENT DISCLOSURES sampling or testing by-products in accordance with applicable laws and regulations.
<br /> 4.1 Where the Services requires ECS to penetrate a surface, CLIENT shall fumish 10.0 ENVIRONMENTAL RISKS
<br /> and/or shall direct CLiENT"S or CLIENT'S Contractors to furnish ECS Information 10.1 When Hazardous Materials are known,assumed,suspected to ex€st,or discovered
<br /> identifying the type and location of utility lines and other man-made objects known, at the Site,ECS will endeavor to protect its employees and address public health,
<br /> suspected,or assumed to be located beneath or behind the Site's surface. ECS safety,and environmental issues In accordance with the Standard of Care. CLIENT
<br /> shall be entitled to rely on such information for completeness and accuracy without agrees to compensate ECS for such efforts.
<br /> further investigation,analysis,or evaluation. 10.2 When Hazardous Materials are known, assumed, or suspected to exist, or
<br /> 4.2 "Hazardous Materials"shall include but not he limited to any substance that poses discovered at the Site,ECS and/or ECS'subcontractors will exercise the Standard
<br /> or may pose a present or potential hazard to human health or the environment of Care in containerizing and labeling such Hazardous Materials in accordance with
<br /> what her contairned in a product,material,by-product,waste,or sample,and whether applicable laws and regulations,and will leave the containers an Site. CLIENT is
<br /> it exists in a solid,liquid,semi-solid or gaseous farm.CLIENT shall notify ECS cf responsible for the retrieval,removal,transport and disposal of such contaminated
<br /> any known, assumed, or suspected regulated, contaminated, or other similar samples,and sampling process byproducts in accordance with applicable law and
<br /> Hazardous Materials that may exist at the Site prior to ECS mobilizing to the Site. regulation.
<br /> 4.3 If any Hazardous Materials are discovered,or are reasonably suspected by ECS 10.3 Unless explicitly stated in the Scope of Services.ECS will neither subcontract for
<br /> after its Services begin,ECS shall be entitled to amend the scope of Services and nor arrange for the Iransport,disposal,or treatment of Hazardous Materials. At
<br /> adjust its fees or fee schedule to reflect any additional work or personal protective CLIENT'S written request, ECS may assist CLIENT In Identifying appropriate
<br /> equipment andlor safety precautions required by the existence of such Hazardous alternatives for transport,off-slle treatment,storage,or disposal of such substances.
<br /> Materials. but CLIENT shall be solely responsible for the final selection of methods and firms
<br /> 5.0 INFORMATION PROVIDED BY OTHERS - CLIENT waives, releases and to provide such services. CLIENT shall sign all manifests for the disposal of
<br /> discharges ECS from and against any claim for damage,injury or lass allegedly arising out substances affected p contaminants and shall oche wise exercise prudence in
<br /> of or in eonneclion with errors, omissions, or inaccuracies In documents and other arranging for lawful dissposal.
<br /> information in any form provided to ECS by CLIENT of CLIENT's Contractors,including 10.4 In those Instances where ECS is expressly relalned by CLIENT to assist CLIENT in
<br /> such information that becomes incorporated into ECS documents. the disposal of Hazardous Materials,samples,or wastes as part of the Proposal,
<br /> ECS shall do so only as CLIENT'S agent(notwithstanding any other provision of
<br /> 6.0 CONCEALED RISKS •CLIENT acknowledges that special Make are inherent in this Agreement to the contrary). ECS will not assume the role of,nor be considered
<br /> sampling,testing and/or evaluating concealed conditions that are hidden from view andlor a generator,scorer,transporter,or disposer of Hazardous Materials.
<br /> neither readably apparent nor easily accessible, e.g., subsurface conditions, conditions 10,5 Subsurface sampling may result In unavoidable cross-contamination of certain
<br /> behind a wall,beneath a floor,or above a calling.Such circumstances require that certain subsurface areas,as when a probe or excavat€"oring device moves through a
<br /> assumptions be made regarding existing conditions,which may not be verifiable without contaminated zone and links It to an aquifer, underground stream,pervious soil
<br /> expending additional sums of money or destroying otherwise adequate or serviceable stratum, or other hydrous body not previously contaminated, or connects an
<br /> portions of a building or component thereof.Accordingly,ECS shall not be responsible for uncontaminated zone with a contaminated zone. Because sampling Is an essential
<br /> the verification of such conditions unless verification can be made by simple visual element of the Services indicated herein, CLIENT agrees this risk cannot he
<br /> observation.CLIENT agrees to bear any and all costs, losses,damages and expenses elirrdnated. Provided such services were performed In accordance with the
<br /> (including,but not limited to,the cost of ECS'addilonal services)In any way arising from or Standard of Care,CLIENT waives,releases and discharges ECS from and against
<br /> in connection with the existence or discovery of such concealed or unknown conditions. any claim for damage,injury,or loss allegedly arising from or related to such cross-
<br /> 7.0 RIG HT OF ENTRYIDAMAGE RESULTING FROM SERVICES contamination,
<br /> 7.1 CLIENT warrants that ll possesses the authority to grant ECS right of entry to the 1GM CLIENT understands that a Phase I Environmental Site Assessment (ESA) is
<br /> site for the performance of Services. CLIENT hereby grants ECS and its agents, of the siteted solely to permit ECS to render a ntalprof Conditional ion
<br /> on,in,beneath,
<br /> the Ilkor near
<br /> subcontractors andlor subconsultants ("Subconsullants'), the right to enter From of the site having a Recognized Environmental Condition on,in,beneath,or near
<br /> time to time onto the property in order for ECS to perform Its Services. CLIENT me Site at the time the Services are conducted.conduct matter haw thorough a Phase I
<br /> agrees to indemnify and hold ECS and its Subconsultants harmless from any claims ESA study may state
<br /> findings derived from itstheSite
<br /> are highly t d or and ECS
<br /> arising from allegations that ECS trespassed crlacked authority to access the Site. cannot know or state for an absolute fact that the Site is unaffected or adversely
<br /> ECS Proposal No:06:21628 Page 1 of 3 ver.OV14113
<br />
|