Browse
Search
2019-690-E IT NWN server patching
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-690-E IT NWN server patching
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 12:22:43 PM
Creation date
10/7/2019 2:03:50 PM
Metadata
Fields
Template:
Contract
Date
9/30/2019
Contract Starting Date
10/1/2019
Contract Ending Date
9/30/2020
Contract Document Type
Agreement - Services
Amount
$13,681.00
Document Relationships
R 2019-690 IT - NWN server patching
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Government <br />Exchange 2016 Upgrade <br />Project # OP132913 / r1.0 <br /> <br />www.NWNIT.com Page 9 of 19 <br /> NWN will configure all roles and configure the CAS array for load balancing / high availability (Netscaler <br />load balancing to be configured by customer) <br /> NWN will work with customer to update spam filtering and archiving software as needed to support <br />Exchange 2016, utilizing vendor support from each product if necessary <br /> NWN will test new mail servers, integrate into existing mail environment and adjust mail flow <br /> NWN will test mail flow <br /> NWN will migrate five(5) pilot mail boxes to new environment and test functionality for these mail boxes <br /> NWN will remediate any issues with new mail environment and prepare for migration <br /> NWN will perform the mailbox migrations based on plan developed in planning meeting <br /> Post migration NWN will work with customer to remove the old mail servers from the environment and <br />delete the virtual machines <br /> GATE REVIEW: Production readiness acceptance – NWN will review the production cutover and <br />implementation with the customer to verify that the solution is functioning in their environment as <br />presented in this scope and the detailed design from the earlier Gate Review. <br /> <br />Deliverables: <br /> New Exchange 2016 virtual machines created and configured for CAS array, mailbox server <br /> Mailflow migrated to new Exchange environment <br /> Pilot mailboxes migrated and tested <br /> Remaining mailboxes migrated per plan from planning phase <br /> Removal of old mail servers <br /> <br />5 - Transition Phase <br />Activities in this phase of the project include: <br />Project closure meeting – NWN will conduct a project review, acceptance and closure meeting to close out the <br />project, This will include a review of the scope for completion, BOM deliverables, final documents and customer <br />acceptance and survey documents. <br /> <br />Deliverables: <br /> Project closure meeting <br /> <br />Out of Scope <br />Any area not specifically presented in the Scope section of this proposal is considered outside the scope of this <br />project. <br />DocuSign Envelope ID: FF254AC2-A2B9-499C-9291-7BB8C3594EB7
The URL can be used to link to this page
Your browser does not support the video tag.