Browse
Search
2019-690-E IT NWN server patching
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-690-E IT NWN server patching
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 12:22:43 PM
Creation date
10/7/2019 2:03:50 PM
Metadata
Fields
Template:
Contract
Date
9/30/2019
Contract Starting Date
10/1/2019
Contract Ending Date
9/30/2020
Contract Document Type
Agreement - Services
Amount
$13,681.00
Document Relationships
R 2019-690 IT - NWN server patching
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Government <br />Exchange 2016 Upgrade <br />Project # OP132913 / r1.0 <br /> <br />www.NWNIT.com Page 8 of 19 <br /> Functionality testing procedures – NWN will discuss with the customer their plan for performing testing <br />after the upgrade has been completed. This will be used during the Execute Phase of the project. <br /> Finalize delivery schedule <br /> GATE REVIEW: Design Acceptance – NWN will conduct a design review and acceptance session with the <br />customer to review the design details prior to initiating any production implementation or changes. The <br />customer’s acceptance of the design is the approval to move forward in the project. <br /> <br /> <br />Deliverables: <br /> Design & Planning Meeting <br /> Detailed Upgrade documents <br /> Upgrade Design acceptance meeting <br /> <br />3 – Prepare Phase <br />The phase details activities that are required to prepare and make the environment ready for the upgrade. <br />Activities in this phase of the project include: <br /> NWN will verify all existing servers and software are at the required version to perform the upgrades <br /> NWN will verify that required resources existing (CPU, Memory, Disk space) in the environment to <br />accommodate the Exchange servers <br /> NWN will work with customer to obtain required software installs and licenses <br /> <br />Deliverables: <br /> Current Exchange environment is at the correct service pack/patch level for the upgrade/migration <br /> Install files and licenses are available for the new servers <br /> <br /> <br />4 - Execute Phase <br />This is the main delivery phase of the project. Activities in this phase of the project include: <br /> NWN will create a Windows Server 2016 virtual machine template on the Nutanix cluster <br /> NWN will create three(3) new Windows Server 2016 virtual machines to host the new mail servers from <br />template <br /> NWN will install the Microsoft Exchange 2016 software and patch (as required) <br /> NWN will create the storage environment for the database server consisting of volumes for mailbox DBs, <br />replication logs, etc <br />DocuSign Envelope ID: FF254AC2-A2B9-499C-9291-7BB8C3594EB7
The URL can be used to link to this page
Your browser does not support the video tag.