Browse
Search
Agenda - 03-28-2001-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 03-28-2001
>
Agenda - 03-28-2001-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 12:37:43 PM
Creation date
8/29/2008 10:30:01 AM
Metadata
Fields
Template:
BOCC
Date
3/28/2001
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 03-28-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2— March 22, 2001 <br />Transportation. It is interesting to note that the Town of Carrboro requires that <br />applicants reimburse the Town for 80 percent of its engineering services, and this <br />cost is included in the Smith Middle School project. For East Chapel Hill High <br />School, the Town of Chapel Hill required CHCCS to increase the number of <br />parking spaces in order to accommodate potential overflow from a Town park <br />located across the street. In addition, the school system was required to <br />construct a pedestrian walkway located on property adjacent to the high school. <br />While the school district did incur additional costs for these items, staff was not <br />able to identify the specific costs of these additions. Other examples required <br />during construction of new schools in both systems include installation of <br />sprinkler systems, removal of site clearing debris (instead of burning), and <br />installation of storm water management systems. <br />Feel free to contact me if you have additional comments or questions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.