Browse
Search
Agenda - 03-20-2001-9d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 03-20-2001
>
Agenda - 03-20-2001-9d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 6:05:13 PM
Creation date
8/29/2008 10:29:57 AM
Metadata
Fields
Template:
BOCC
Date
3/20/2001
Document Type
Agenda
Agenda Item
9d
Document Relationships
Minutes - 03-20-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
NS RES-2001-031 Resolution approving High Rock Farms Phase One Subdivision Preliminary Plat
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. <br />17 <br />1~1OTES: <br />The design flow is based upon the number of bedrooms applied for by the property owner or developer. The design flow for a beds <br />120 gallons day (GPD). (e. g. 480 GPD = 4 bedrooms) <br />Proposed house locations are provided by the property owner or developer as required by 15A NCAC 18A .1900 - .1969. (The Law <br />Rules for Sewage Treatment and Disposal Systems) <br />The design Clow, type system, and pump requirement are subject to change based upon the application and site plan or plat submitte~ <br />the Construction Authorization. <br />The blocked areas on the accompanying plat are the limits of the provisionally suitable soils as evaluated by the Orange County Hea <br />Department. <br />It should be noted that all lots having aconventional-type drain field with pump are reviewed at a minimum of every five years by tt <br />health department as required by 15 A NCAC 18A .1961 (Maintenance of Sewage Systems). <br />Ultra Shallow Trench Conventional Systems are placed in areas with 24 inches or more of provisionally suitable characteristics and <br />inch soil cap is placed over the trenches. <br />Shallow Trench Conventional Systems are placed in areas with 30 inches or more of provisionally suitable characteristics. . <br />Conventional Systems are placed in areas with 3G inches or more of provisionally suitable characteristics. <br />The ~ roved se tic areas should be ke t free of vehicular traffic to min radio and cvm actin activities. It is the respon <br />of the property owner or developer to maintain the integrity of the septic areas prior to system construction and installation. No park <br />cutting, or filling shall be allowed. <br />This report is for planning purposes only and does not constitute any approval. Lot approval is granted only in the form of an Impro~ <br />Perntit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.