26 <br /> 1 The new 8,500 square foot Parks Operations Base would replace scattered facilities and a base <br /> 2 and shop at Millhouse Road Park that is used primarily for office space and equipment storage. <br /> 3 <br /> 4 Bordeaux Construction advertised a request for qualifications in March 2019 and solicited over <br /> 5 850 firms for 36 different bid packages. Nineteen (19) of those packages included reduced <br /> 6 prequalification thresholds and bonding requirements to encourage the participation of small <br /> 7 and minority owned businesses. A local and minority business outreach session was held on <br /> 8 April 22, 2019. <br /> 9 <br /> 10 Competitive bids from first tier subcontractors were opened on August 13, 2019 and on August <br /> 11 23, 2019. These bids were used to identify the lowest, responsible subcontractor bid for each <br /> 12 bid package. The bid packages totaled over$31.7 million in construction costs and ranged from <br /> 13 a $5.3 million bid for earthwork to a $14,600 bid for lockers. Over twenty-one percent (21%) of <br /> 14 the cost of work is anticipated to be contracted with Minority Owned Businesses (MBEs) that are <br /> 15 certified with the State of North Carolina Department of Administration (NC DOA). The <br /> 16 statutorily required goal for public works projects is ten percent (10%). <br /> 17 <br /> 18 After the subcontractor bids were finalized, the Construction Manager led a value engineering <br /> 19 exercise to identify cost reduction options that would not affect the functionality of the project <br /> 20 elements. Those options were reviewed by County staff and the project architects, and a total of <br /> 21 over$466,000 in value engineering options are recommended to reduce the overall cost of the <br /> 22 project. <br /> 23 <br /> 24 Bordeaux Construction has presented the County with a total guaranteed maximum price <br /> 25 (GMP) of$36,354,082 to deliver all of the elements of the Northern Orange County Campus <br /> 26 after deducting the value engineering options. The components of the GMP are detailed in <br /> 27 Attachment 1 and summarized in the following table: <br /> 28 <br /> 29 GMP Component Proposed Cost <br /> 30 Subcontractor Bids (Cost of Work) $31,269,947 <br /> 31 <br /> 32 General Conditions &Allowances $1,798,693 <br /> 33 Tap Fees & Permits <br /> 34 Other Misc. Expenses <br /> 35 <br /> 36 Owner's Contingency $600,000 <br /> 37 Owner Directed Changes <br /> 38 <br /> 39 Construction Manager Contingency $625,399 <br /> 40 Unknown Construction Costs <br /> 41 <br /> 42 Early Completion Bonus $1,628,966 <br /> 43 1% of Cost of Work <br /> 44 <br /> 45 Construction Manager Fee <br /> 46 3.75% of Cost of Work <br /> 47 <br /> 48 Bonds and Insurance $431,076 <br /> 49 1.2% of Cost of Work <br /> 50 TOTAL GUARANTEED MAXIMUM <br /> 51 PRICE $36,354,082 <br />