Browse
Search
2019-648-E AMS - Sasser Companies Inc DSS Hillsborough Commons Atrium remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-648-E AMS - Sasser Companies Inc DSS Hillsborough Commons Atrium remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:58:59 AM
Creation date
9/26/2019 9:30:13 AM
Metadata
Fields
Template:
Contract
Date
9/30/2019
Contract Starting Date
9/30/2019
Contract Ending Date
12/31/2019
Contract Document Type
Agreement - Construction
Amount
$11,070.00
Document Relationships
R 2019-648 AMS - Sasser Companies Inc DSS Hillsborough Commons Atrium remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:60153825-B133-48F8-824D-16A4BB63929B <br /> NORTH CAROLINA CONSTRUCTION SERVICES <br /> AGREEMENT UNDER$50,000 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter "Agreement"), is made and entered <br /> into this 30th day of September, 2019 by and between Orange County, North Carolina <br /> (hereinafter the "County" and/or "Owner") parry of the first part; and Sasser Companies, Inc. <br /> (hereinafter the "Contractor"),party of the second part; <br /> WITNESSETH: <br /> For the purpose and subject to the terms and conditions hereinafter set forth, the Owner <br /> hereby contracts for the construction services of the Contractor, and the Contractor agrees to <br /> provide the construction services to the Owner in accordance with the terms of this Agreement. <br /> 1. TERM AND MAXIMUM AMOUNT PAYABLE <br /> Beginning and ending dates of contract: September 30, 2019 through December 31, 2019. <br /> The Project Commencement Date shall be September 30, 2019. Dollar Amount Not to Exceed: <br /> Eleven Thousand Seventy Dollars ($11,070.00) <br /> 2. SERVICES <br /> Contractor agrees to provide the following construction services (the "Work"): The work to <br /> be preformed: Containment, Demolition, and Remediation for the Atrium at the Orange County <br /> Department of Social Services at Hillsborough Commons. *Two air scrubers are currently within <br /> the contained atrium area. Billing will pick up from August 28, 2019, where it was left off on the <br /> original proposal dated August 23, 2019 *A frame will be constructed around the affected area of <br /> the atrium, constructed of wood (2x4's), PVC, or metal pipe, wrapped in 6-mil oly to form a <br /> containment box or chamber. A heavy, reinforced zipper will be placed for access to the <br /> chamber. Exact dimensions wil be determined prior to the start of the project but roughly <br /> 22'x22'x8'. *One of the two air scrubers will be placed within the containment chamber, set up <br /> under negative pressure during the demolition phase of the project. The second air scrubber will <br /> remain on the exterior of the containment chamber to continously clean/scrub the air within the <br /> atrium, serve as a secondary precaution in the event of an accidental spore release, ensuring that <br /> there remains the efficiency of the suggested 4 to 6 air changes per hour, ultimately ensuring the <br /> indoor air quality within the atrium remains at acceptable levels. *Demolition and Disposal will <br /> consist of the following:-Removal and disposal of the wooden wall/ 3' wall. -Removal and <br /> disposal of all books and toys (cost of replacement would be cheaper than the cost to remediate <br /> per the standards of the IICRC's S520) except for the following: 1) Plastic Playhouse 2) Plastic <br /> Play Tunnel 3) Plastic Play Bridge 4) Plastic Rabbit 5) Plastic Turtle. Removal of the built-up <br /> section in this area, (storage area). Everything will be removed to the point of a bare floor except <br /> for the plastic playhouse, plastic tunnel, plastic play bridge, plastic turtle, and plastic rabbit. The <br /> above-mentioned items will be cleaned and left within the containment for testing unless Orange <br /> County would rather have them removed.(There is not a price difference between the cleaning or <br /> disposing of those items). -VCT floor tile within the containment chamber will be addressed as <br /> follows: *Tiles that are coming up will be removed and discarded. *Tiles that require minor <br /> scraping will be removed and discarded. *Tiles that require more aggressive methods for <br /> removal due to properly holding mastic, will be addressed in the repair phase, which is not <br /> currently being quoted. * At the completion of the demolition, the air scrubber within the <br /> Revised 12/18 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.