Browse
Search
2019-640-E AMS - Siemens Building Technologies ES HVAC controls
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-640-E AMS - Siemens Building Technologies ES HVAC controls
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2019 9:00:10 AM
Creation date
9/19/2019 8:48:03 AM
Metadata
Fields
Template:
Contract
Date
9/16/2019
Contract Starting Date
9/16/2019
Contract Ending Date
1/30/2020
Contract Document Type
Agreement - Construction
Amount
$39,125.00
Document Relationships
R 2019-640 AMS - Siemens Building Technologies ES HVAC controls
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:299C1 D9F-FB2B-45B9-AA1 F-9C3418D1287B <br /> Jake Snyder <br /> Sales Executive SIEMENS <br /> 215 Southport Dr,Suite 900 <br /> Morrisville,NC 27560 Building Technologies <br /> Mobile: (919)413-1666 <br /> Email:jacob.snyder@siemens.com <br /> Exclusions&Clarifications(applies to all sections) <br /> 1. Pricing assumes normal hours(Monday-Friday). <br /> 2. Control of units via BACnet integration will be limited to the BACnet points available in the existing <br /> equipment. <br /> 3. This project assumes integration and control via the Siemens Desigo CC BMS that is currently being <br /> installed under another project. Siemens will not connect this system to the obsolete Insight BMS. <br /> 4. Excludes furnishing and installation of the following unless noted otherwise in this proposal; <br /> a. Fire Smoke Dampers(FSD)or Smoke Control Dampers(SCDs) <br /> b. Power to FSDs or SCDs. 120V power provided by Electrical Contractor(shown as 120V in <br /> electrical drawings) <br /> c. Starters or disconnects <br /> d. Line voltage power <br /> e. Control Dampers <br /> 5. Repairs or replacement due to existing failures.We will bring these issues to your attention when <br /> found. <br /> 6. Proposal excludes any labor or materials beyond the scope of this project <br /> 7. Bond is Excluded <br /> 8. Excludes any civil,structural,or architectural penetrations or finishing. <br /> 9. Excludes high voltage electrical wiring <br /> 10. Excludes Fire Panel and Life Safety. <br /> 11. Excludes any on-going service tasks. <br /> 12. Excludes IP drops that may be necessary for new control panels. <br /> 13. Proposal excludes sales tax. Sales tax will be included on the invoice unless Siemens receives a completed <br /> NCDOR E589CI(North Carolina Affidavit of Capital Expenditures). We have included an NCDOR E589CI <br /> form with this proposal for your convenience. <br /> Page 3 of 7 <br /> Initials <br />
The URL can be used to link to this page
Your browser does not support the video tag.