Browse
Search
Agenda - 03-20-2001-
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 03-20-2001
>
Agenda - 03-20-2001-
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 6:12:11 PM
Creation date
8/29/2008 10:29:41 AM
Metadata
Fields
Template:
BOCC
Date
3/20/2001
Document Type
Agenda
Document Relationships
Minutes - 03-20-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />STATUS OF PARK PROJECTS <br />Hillsborough Township <br />March 16, 2001 <br />FAIRVIEW PARK BALLFYELD <br />Following a review of the environmental site assessment prepared by Trigon Engineering <br />Consultants, it was determined that the ball field area at Fairview Park could be rehabilitated and <br />improved to provide an adequate and safe playing area. Though test results found the area to <br />contain some refuse and debris there were no environmental contaminants present at the site at <br />levels such that use of the site for recreational activities would be unwise. <br />• In October, 2000 staff received recommendations for site improvements to include removal <br />of surface growth, grading, hauling in red clay, seeding, and installing backstop and fencing <br />and bleachers at a preliminary estimate of $40,000. <br />• On November 30, 2000 the ad hoc committee of Town and County Commissioners and staff <br />reviewed the recommendations and discussed ways to reduce the cost that would be feasible <br />to the project. <br />• At the December County Commissioners Retreat, the Board endorsed in concept the <br />construction of an improved playing field and authorized staff to proceed with the <br />improvement projects. Staffwas also directed to determine availability of existing fill <br />material and haul to the site or to contract forces to accomplish the work. <br />On January 11, 2001 staff met to identify equipment needs to haul fill materials and to grade <br />the site. It was also determined that existing fill materials for another site was not available. <br />• On January 17, 2001 staff from the Town and County concluded that proper equipment was <br />not available For hauling and grading. It was also decided that the existing fill material at the <br />southern portion ofthe Fairview Pazk site be used on the field to reduce cost of outside <br />sources. <br />• On February 15, bids were received and awarded in the amount of $17,600 with additional <br />costs for bringing in needed fill material at $6.00 /cubic yard. Backstop fencing and <br />bleachers aze estimated to cost approximately $12,000. <br />• To Date: Contractors are on site and it is anticipated that the field will be playable by the <br />first week in June. <br />
The URL can be used to link to this page
Your browser does not support the video tag.