Orange County NC Website
Technical Committee 7/24/2019 Item 11 30 <br /> NCDOT DIV 7 PROJECTS LOCATED/N DCHCMPO-UNDER DEVELOPMENT <br /> TIPMBS# Description Let/Start Completion Cost Status Project Lead <br /> Date Date <br /> 1-5959 Pavement Rehabilitation on 1-85 from West of SR 1006 11/21/2023 FY 2025 $11,155,000 Funding approved 10/10/17, Chris Smitherman <br /> 45911.1.1 (Orange Grove Road)to Durham County line Coordinate with 1-5967,1-5984,1- <br /> 45911.3.1 5983 and 1-0305 <br /> 1-5967 Interchange improvements at 1-85 and SR 1009(South 1/16/2024 FY 2027 $20,700,000 Planning and Design activities Laura Sutton <br /> 45917.1.1 Churton Street)in Hillsborough underway,Coordinate with 1-0305 <br /> 45917.2.1 and U-5845 <br /> 45917.3.1 <br /> U-5845 Widen SR 1009(South Churton Street)to multi-lanes from 1-1/16/2024 FY 2027 $49,751,000 Planning and Design activities Laura Sutton <br /> 50235.1.1 40 to Eno River in Hillsborough underway,Coordinate with U-5848 <br /> 50235.2.1 and 1-5967 <br /> 50235.3.1 <br /> 1-5984 Interchange improvements at 1-85 and NC 86 in 11/18/2025 FY 2027 $16,488,000 Funding approved 10/10/17, Laura Sutton <br /> 47530.1.1 Hillsborough Coordinate with 1-0305 and 1-5959 <br /> 47530.2.1 <br /> 47530.3.1 <br /> U-6071 Intersection improvements at NC 54 and SR 1007(Old 1/15/2026 FY 2027 $1,216,000 Planning and design activities Chris Smitherman <br /> 47496.1.1 Fayetteville Rd)in Carrboro underway,Project on hold per Draft <br /> 47496.2.1 2020-2029 STIP(unfunded project) <br /> 47496.3.1 <br /> 1-5983 Widen 1-85 in Orange Co.from west of SR1713(Mt. 10/20/2026 FY2029 $53,460,000 Planning and Design activities Laura Sutton <br /> 47529.1.1 Hermon Church Rd)to Durham Co.line underway,Coordinate with U-5848, <br /> 47529.2.1 1-0305 and 1-5984 <br /> 47529.3.1 <br /> 1-0305 Widening of 1-85 from west of SR1006(Orange Grove 1/1/2027 FY2029 $133,400,000 Planning and design activities Laura Sutton <br /> 34142.1.2 Road)in Orange Co.to west of SR 1400(Sparger Road)in underway,Project reinstated per <br /> 34142.2.2 Orange Co. Draft 2020-2029 STIP(funded <br /> 34142.3.2 project) <br /> Page 3 DCHCMPO Jun.2019 <br /> Page 16 of 19 <br />