Orange County NC Website
Technical Committee 7/24/2019 Item 11 99 <br /> NCDOT DIV 7 PROJECTS LOCATED/N DCHCMPO-UNDER DEVELOPMENT <br /> TIP/WBS# Description Let/Start Completion Cost Status Project Lead <br /> Date Date <br /> U-5847 Intersection improvements at SR 1010(West Franklin St.) 5/31/2019 Sept.2019 $775,000 Planning and design activities Chris Smitherman <br /> 50238.1.1 and SR 1771(Merritt Mill Rd)/SR1927(Brewer Lane)in underway,bike/ped improvements <br /> 50238.2.1 Chapel Hill/Carrboro. to be completed under project <br /> 50238.3.1 48283 <br /> SS-4907CD Horizontal curve improvements on SR 1710(Old NC 10) 12/5/2019 Spring 2020 $261,000 Planning and design activities Chad Reimakoski <br /> 47936.1.1 west of SR 1561/SR 1709(Lawrence Road)east of underway,ROW activities June/July <br /> 47936.2.1 Hillsborough. Improvements consist of wedging pavement 2019 <br /> 47936.3.1 and grading shoulders. <br /> 1-3306A Widening 1-40 from 1-85 in Orange Co.to Durham Co.line TBD TBD $98,800,000 Planning and design activities Laura Sutton <br /> 34178.1.3 (US 15/501 Interchange) underway,Public meeting 1/24/19, <br /> 34718.2.2 No schedule at this time other than <br /> 34178.3.3 CE document scheduled for <br /> 3/29/19,Combined w/1-3306AC <br /> P-5701 Construct Platform,Passenger Rail Station Building at 6/30/2021 FY2022 $7,200,000 PE funding scheduled 711/2020, Matthew Simmons <br /> 46395.1.1 Milepost 41.7 Norfolk Southern H-line in Hillsborough Coordinate with U-5848 <br /> 46395.3.1 <br /> R-5821A Construct operational improvements including 6/21/2022 FY2024 $3,924,000 Planning and design activities Chris Smitherman <br /> 47093.1.2 Bicycle/Pedestrian accommodations on NC 54 from SR underway,coordinating with NC54 <br /> 47093.2.2 1006(Orange Grove Road)to SR 1107/SR 1937(Old West Corridor Study <br /> 47093.3.2 Fayetteville Road). <br /> U-5848 Extend SR 1006(Orange Grove Road)on new location with 3/21/2023 FY 2025 $5,326,000 Planning and Design activities Laura Sutton <br /> 50237.1.1 Sidewalks and bike lanes from existing SR 1006(Orange underway,Coordinate with P-5701 <br /> 50237.2.1 Grove Road)to US 70 Business in Hillsborough. and U-5845 <br /> 50237.3.1 <br /> 1-3306AC Interchange improvements at 1-40 and NC86 in Chapel Hill 3/21/2023 FY 2025 $16,500,000 Planning and Design activities Laura Sutton <br /> 34178.1.6 underway,Combined w/1-3306A <br /> 34178.2.5 <br /> 434178.3.9 <br /> Page 2 DCHCMPO Jun.2019 <br /> Page 15 of 19 <br />