Orange County NC Website
23 <br /> Burlington-Graham MPO Getting There 2045 MTP Update <br /> Vision, Goals and Objectives <br /> Updated June 26, 2019 <br /> Vision <br /> Getting There 2045 Plan will support the investment in a multimodal transportation network for a vibrant and prosperous <br /> Burlington-Graham region where residents of all ages have access to opportunities and a good quality of life, businesses <br /> can grow and thrive, and the natural and cultural resources of the region are protected. <br /> Goals and Objectives Development <br /> Goals and Objectives Metrics <br /> Provide a safe,secure,comprehensive,and effective <br /> transportation system to move people and goods <br /> within and through the area <br /> Objective 1A Enhance mobility and accessibility and manage congestion Travel Time Reliability utilizing TTI(Travel Time Index from <br /> across the transportation system and across modes of INRIX/HERE data)for interstates and US routes <br /> transportation . Bicycle,pedestrian and transit access to passenger rail stations <br /> (metric to be refined) <br /> . Ridership on passenger rail and transit <br /> Objective 16 Support projects,programs,and policies that advance safe . Reduce non-motorized fatalities and serious injuries rate(5-year <br /> and secure travel for all transportation system users average)(utilizing NCDOT data) <br /> . Reduce serious injury and fatality crash rates(utilizing NCDOT data) <br /> Objective 1D Plan and support a freight transportation system that allows . The number of at-grade rail crossings <br /> for the efficient movement of goods <br /> Objective 1E Improve resiliency and reliability of the transportation system . The number of deficient bridges/roads <br /> through increasing roadway network connectivity and <br /> supporting multiple route options <br /> \\vhb\gbl\pro'\Raleigh\38912.00 BGMPO 2045MTP Burlington\tech\Goals and Objectives\Goals and Objectives Updated 1une26 2019.doc <br /> CID <br /> CY <br />