Browse
Search
OUTBoard agenda 082119
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2019
>
OUTBoard agenda 082119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:58:01 AM
Creation date
9/10/2019 3:32:06 PM
Metadata
Fields
Template:
BOCC
Date
8/21/2019
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 <br /> ORANGE COUNTY <br /> ORANGE UNIFIED TRANSPORTATION BOARD <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: August 21, 2019 <br /> Action Agenda <br /> Item No. 5.b. <br /> SUBJECT: Draft Carrboro Bike Plan <br /> DEPARTMENT: Planning and Inspections <br /> ATTACHMENTS: INFORMATION CONTACT: <br /> 1. Draft Carrboro Bike Plan Map Series Zachary Hallock, Town of Carrboro <br /> PURPOSE: Receive an update on the Carrboro Bike Plan; and review and provide comments <br /> on the Draft Carrboro Bike Plan Map Series regional Orange County connections. <br /> BACKGROUND: In 2018, the Town of Carrboro was awarded a planning grant from the North <br /> Carolina Department of Transportation (NCDOT) to update its comprehensive bicycle <br /> transportation plan. The overall goal of the Project is to provide a framework for NCDOT and the <br /> Town to enhance bicycling as a mode of transportation for residents and visitors alike, improving <br /> access, connectivity, and safety. Additional goals include promoting healthy active lifestyles, <br /> diversifying the local economy, and reducing transportation-related greenhouse gas emissions. <br /> The planning process was initiated in late 2018 and includes identified key routes, connections, <br /> opportunities, obstacles, and prioritized areas for future implementation. The draft plan review <br /> and revisions are to be completed in September or October, and final plan and presentations <br /> are scheduled for this winter. <br /> Planning staff has participated on the steering committee for the plan update, with a particular <br /> focus on regional connectivity. Attachment A provides four separate network maps: <br /> 1) Existing Network <br /> 2) Existing & In Development <br /> 3) Existing, In Development, & Strategic Priorities <br /> 4) Long-term Network <br /> The OUTBoard is being requested to review the regional Orange County connections depicted <br /> on the maps. The OUTBoard's review comments will be provided to Carrboro planners for <br /> consideration in finalizing the bike plan update. <br /> FINANCIAL IMPACT: There is no immediate financial impact associated with this item. <br /> RECOMMENDATION(S): Staff recommends OUTBoard provide comments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.