Orange County NC Website
DocuSign Envelope ID: 12DCC4E1-4D61-4DOE-A2A2-7C6E689613AC <br /> Orange County Southern Expansion Smith Sinnett/2017027 <br /> Phase 1 —Seymour Center Renovation and Addition Orange County <br /> SECTLO1-f pQ 42 00-Y-ROPOSAI.,I<HM <br /> PROJECT: Orange County Southern Expansion <br /> Phase I —Seymour Center Renovation and Addition <br /> 2551 Homestead Road <br /> Chapel Hill,North Carolina 27516 <br /> OWNER: Orange County <br /> 200 South Cameron Street <br /> Hillsborough,North Carolina 27278 <br /> ARCHITECT: Smith Sinnett Architecture <br /> 4600 Lake Boone Trail,Suite 205 <br /> Raleigh,North Carolina 27607 <br /> The undersigned,as bidder,liereby declares that the only person or persons interested in this proposal as principal or <br /> principals is or are named herein and that no other person than herein mentioned has any interest in this proposal Or- <br /> in the contract to be entered into;that this proposal is made without connection with any other person,company or <br /> parties making a bid or proposal;and that it is in all respects fair and in good faith without collusion or fraud. The e <br /> bidder fiirllier declares[hat lie has examined the site of the work and the contract documents relative thereto and has <br /> read all special provisions furnished prior to the opening of bids;that he has satisfied himself relative to the work to <br /> be performed. <br /> The Bidder proposes and agrees if this proposal is accepted to contract with Orange Comm in the form of contract <br /> specified below, [o furnish all necessary materials,equipment, machinery, loots, apparatus,means of transportation <br /> and labor necessary to complete the construction of <br /> Orange County Southern Expansion Phase I —Renovation and Addition <br /> in full in complete accordance with the plans,specifications and contract documents,to the full and entire <br /> satisfaction of the Orange t ounty,and Smith Sinnett Are with a definite understanding that no money will # <br /> be allowed for extra work except as set forth in the General Conditions and the contract documents. <br /> The low Bidder will be determined by the total cost of the Contract with the lump sum prices of the alternates s <br /> accepted being added to or deducted from the Base Bid to give the total cost of the Contract,Bidders are required to <br /> give a price for Base Bid,all Alternates,and all Unit Prices as applicable to their Contract.All Bidders are required <br /> to be licensed and in good standing with their respective North Carolina Licensing Board. <br /> PROPOSAL FORMS Proposal- 1 <br />