Browse
Search
2019-496-E AMS - Muter Construction Seymour Center expansion
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-496-E AMS - Muter Construction Seymour Center expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2019 2:55:22 PM
Creation date
9/6/2019 2:32:31 PM
Metadata
Fields
Template:
Contract
Date
9/10/2019
Contract Starting Date
9/10/2019
Contract Ending Date
10/31/2020
Contract Document Type
Agreement - Construction
Amount
$4,444,500.00
Document Relationships
Agenda 06-18-19 Item 8-l - Authorization for the Manager to Sign a Construction Contract for the Southern Campus Site Improvements, Parking and Seymour Center Expansion
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 06-18-19 Regular Meeting
Minutes 06-18-19 Regular Meeting
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
R 2019-496 AMS - Muter Construction Seymour Center expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 12DCC4E1-4D61-4DOE-A2A2-7C6E689613AC <br /> 27 <br /> 10.1 The Designer is charged with the responsibility of interpretation of the Contract <br /> Documents. The Designer's decisions relating to aesthetic matters shall be final. <br /> 10.2 All Work completed under the Contract Documents shall be subject to review by the <br /> Designer. No Work is to be covered without the Designer's review or prior authorization. <br /> Any Work so covered without the Designer's review or prior authorization shall be uncovered at <br /> the Contractor's expense. The Contractor shall notify the Designer in writing at least twenty-four <br /> (24) hours in advance of covering any Work. <br /> 10.3 The Designer shall not be responsible for the construction means, methods, techniques, <br /> sequences, procedures, or the safety precautions and programs incident thereto, and shall not <br /> be responsible for the Contractor's failure to perform the Work in accordance with the Contract <br /> Documents, but shall be entitled to enforce any requirements in the Contract Documents <br /> specifying particular means, methods, techniques, sequences, or procedures. <br /> 10.4 The Designer shall be an Owner's representative during the construction period. The <br /> duties, responsibilities and authority of the Designer as the Owner's representative during <br /> construction are as set forth in the Contract Documents. <br /> ARTICLE 11. TESTING AND SURVEYING <br /> 11.1 Laboratory and field tests to determine compliance of construction with the Contract <br /> Documents shall be made by the Owner or testing consultants employed by the Owner except <br /> those required elsewhere in the Contract Documents to be paid for by the Contractor. The costs <br /> and expenses of providing samples for and assistance in any testing shall be borne by the <br /> Contractor and are included in the Contract Price. Any Work in which untested materials are <br /> used without approval or written permission of the Designer shall be removed and replaced at <br /> the Contractor's expense. Work found to be unacceptable or unauthorized will not be paid for <br /> and, if directed by the Designer shall be removed and replaced at the Contractor's expense. <br /> Unless otherwise designated, tests in accordance with the cited standard methods of ASTM or <br /> other generally recognized or specifically authorized methods which are current on the date of <br /> advertisement for bids shall be made at the expense of the Owner; provided, however, in the <br /> event that after such testing any Work is found to be defective or does not meet the <br /> requirements of the Contract Documents, the costs of retesting such Work and the costs of <br /> inspection services shall be paid by the Contractor. Samples shall be taken by a testing <br /> laboratory employed by the Owner. All materials being used are subject to inspection, tests, or <br /> rejection at any time prior to or during incorporation into the Work. Copies of all Owner test <br /> reports will be furnished to the Contractor at his written request. Copies of Contractor test <br /> reports shall be furnished to the Designer upon written request. <br /> 11.2 The Owner shall have the right to deduct the costs of additional testing as described in <br /> paragraph 11.1 from any money due the Contractor; or if no money is due the Contractor, the <br /> Owner shall have the right to recover these costs from the Contractor, from its sureties, or from <br /> both. <br /> 11.3 All layouts and surveying shall be accomplished by properly qualified personnel duly <br /> licensed in the State of North Carolina. <br /> ARTICLE 12. SEPARATE CONTRACTS <br /> Revised 12/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.