Browse
Search
2019-496-E AMS - Muter Construction Seymour Center expansion
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-496-E AMS - Muter Construction Seymour Center expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2019 2:55:22 PM
Creation date
9/6/2019 2:32:31 PM
Metadata
Fields
Template:
Contract
Date
9/10/2019
Contract Starting Date
9/10/2019
Contract Ending Date
10/31/2020
Contract Document Type
Agreement - Construction
Amount
$4,444,500.00
Document Relationships
Agenda 06-18-19 Item 8-l - Authorization for the Manager to Sign a Construction Contract for the Southern Campus Site Improvements, Parking and Seymour Center Expansion
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 06-18-19 Regular Meeting
Minutes 06-18-19 Regular Meeting
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
R 2019-496 AMS - Muter Construction Seymour Center expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 12DCC4E1-4D61-4DOE-A2A2-7C6E689613AC <br /> 22 <br /> them, or in the absence of such agreement, as may be directed by the Contract Documents, <br /> Owner, or Designer. The Contractor shall be responsible for any damage to the Owner's <br /> property, or that of others, by the Contractor or the Contractor's employees, Subcontractors, <br /> sub-subcontractors, or their employees or agents, and shall make good such damages. The <br /> Contractor shall be responsible for and pay for any such claims against the Owner. <br /> 7.16 The Contractor shall protect all landscaping designated to remain in the vicinity of the <br /> operations and barricade all walks, roads, and areas as necessary to keep the public away from <br /> the construction. <br /> 7.17 The Contractor shall provide cover and/or protect all portions of the Work and provide all <br /> materials necessary to protect the Work whether performed by the Contractor or any of the <br /> Subcontractors or sub-subcontractors. Any Work damaged through the lack of proper <br /> protection, or from any other cause, shall be repaired or replaced without extra cost to the <br /> Owner or extension to the Contract Time. <br /> The Contractor shall maintain the Work during construction and until the Work is accepted. <br /> This maintenance shall constitute continuous and effective effort prosecuted day by day, with <br /> adequate equipment and forces so that the Work is maintained in satisfactory condition at all <br /> times. All costs of maintenance shall be included in the Contract Price and the Contractor will <br /> not be paid an additional amount for such effort. Should the Owner or Designer observe that the <br /> Contractor at any time has failed to maintain the Work as provided herein, the Designer may <br /> immediately notify the Contractor of such noncompliance. Such notification shall specify a <br /> reasonable time within which the Contractor shall be required to remedy such unsatisfactory <br /> maintenance condition. Should the Contractor fail to properly respond to the Designer's <br /> notification, the Owner may, at the Contractor's expense, take such action as it may deem <br /> appropriate to remedy the defective maintenance, including suspension of the Contractor's <br /> Work or any part thereof. Any such expense incurred by the Owner shall be deducted from <br /> monies due or to become due the Contractor. <br /> Parking lots, streets, and walks connecting to the Project area shall be protected by the <br /> Contractor from deposits of mud, sand, stone, litter, or debris in any form. Pedestrian traffic <br /> areas around the construction limits must be maintained in a clean and safe condition at all <br /> times with required barricades and covered walkways. When excavation or other operations <br /> outside the Project limits is required, the Contractor shall, immediately following that work, <br /> return the area to its original condition. <br /> All catch basins and storm drain lines in the vicinity of the Project site shall be protected at <br /> all times from entry of dirt, rubble and other debris. The residue from the cleaning of trucks, <br /> wheelbarrows, concrete buggies, etc. must be prevented from entering the drainage <br /> system, and if cleaning is done, the residue must be contained and removed from the <br /> Project site with other refuse. <br /> 7.18 No burning of refuse or debris shall be allowed inside or around the Project during the <br /> course of construction without written authority from authorities having jurisdiction and the <br /> Owner. <br /> 7.19 The Contractor shall provide for and maintain necessary safety measures and safety <br /> programs for the protection of all persons involved with the Work. Such measures and programs <br /> Revised 12/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.