Orange County NC Website
DocuSign Envelope ID: 12DCC4E1-4D61-4DOE-A2A2-7C6E689613AC <br /> 19 <br /> Should the Contractor fail to remove such person or persons or fail to furnish suitable and <br /> sufficient personnel for the proper prosecution of the Work within three (3) days after written <br /> order, the Owner may withhold further payment by written notice until compliance with such <br /> order. <br /> 7.4 If, in the opinion of the Designer or the Owner, any Subcontractor on the Project is <br /> incompetent or otherwise unsatisfactory, he shall be replaced by the Contractor with no <br /> increase in the Contract Price if and when directed by the Designer or the Owner in writing. <br /> 7.5 The Contractor shall furnish all materials, equipment, labor, transportation, construction <br /> equipment and machinery, tools appliances, fuel, light, heat, and all other facilities and <br /> incidentals necessary for the execution, maintenance, initial operation, and completion of the <br /> Work, other than those specifically excluded by the Contract Documents and to be furnished by <br /> the Owner or others. When use or storage of hazardous materials or equipment or methods of <br /> more than ordinary risk are necessary in accomplishing the Work, the Contractor shall give the <br /> Owner and Designer reasonable advance notice. <br /> If any materials are to be furnished or installed by the Owner or others under the terms of the <br /> Contract Documents, said materials shall be made available to the Contractor at the location(s) <br /> specified in the Contract Documents. All costs of handling, transportation from the specified <br /> location to the Project, storage, and installing of Owner-furnished materials shall be included in <br /> the Contract Price. The Contractor shall be responsible for any demurrage, damage, loss, or <br /> other deficiencies which may occur during the Contractor's handling, storage, or use of such <br /> Owner-furnished material. The Owner shall deduct from any monies due or to become due the <br /> Contractor any cost incurred by the Owner in making good any such damage, loss, or efficiency. <br /> All equipment which is proposed to be used in the Work shall be of sufficient size and in such <br /> mechanical condition as to meet the requirements of the Work and produce a satisfactory <br /> quality of work. Equipment used on any portion of the Work shall be such that no injury to <br /> previously completed Work, adjacent property, or existing facilities shall result from its use. <br /> When the methods and equipment to be used by the Contractor accomplishing the Work are not <br /> prescribed in the Contract Documents, the Contractor shall be free to use any methods or <br /> equipment that will accomplish the Work in conformity with the requirements of the Contract <br /> Documents. <br /> When the Contract Documents specify the use of certain methods and equipment, such <br /> methods and equipment shall be used unless others are authorized by the Designer. If the <br /> Contractor desires to use a method or type of equipment other than specified in the Contract <br /> Documents, the Contractor may request authority from the Designer to do so. The request shall <br /> be in writing and shall include a full description of the methods and equipment proposed and of <br /> the reasons for desiring to make the change. If approval is given, it shall be on the condition that <br /> the Contractor shall be fully responsible for producing Work in conformity with the requirements <br /> of the Contract Documents. If, after trial use of the substituted methods or equipment, the <br /> Designer determines that the Work produced does not meet the requirements of the Contract <br /> Documents, the Contractor shall discontinue the use of the substitute method or equipment and <br /> shall complete the remaining Work with the specified methods and equipment at no additional <br /> cost to the Owner. The Contractor shall remove any deficient Work and replace it with Work of <br /> Revised 12/18 <br />