Browse
Search
2019-496-E AMS - Muter Construction Seymour Center expansion
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-496-E AMS - Muter Construction Seymour Center expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2019 2:55:22 PM
Creation date
9/6/2019 2:32:31 PM
Metadata
Fields
Template:
Contract
Date
9/10/2019
Contract Starting Date
9/10/2019
Contract Ending Date
10/31/2020
Contract Document Type
Agreement - Construction
Amount
$4,444,500.00
Document Relationships
Agenda 06-18-19 Item 8-l - Authorization for the Manager to Sign a Construction Contract for the Southern Campus Site Improvements, Parking and Seymour Center Expansion
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 06-18-19 Regular Meeting
Minutes 06-18-19 Regular Meeting
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
R 2019-496 AMS - Muter Construction Seymour Center expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 12DCC4E1-4D61-4DOE-A2A2-7C6E689613AC <br /> 10 <br /> Contractor must receive specific written approval from the Owner prior to proceeding with any <br /> Work under the Agreement. <br /> All agents and brokers shall hold valid licenses from the State of North Carolina. Before <br /> commencing mobilization to the Project site and not later than 7 days after the receipt of the <br /> Construction Contract by the Contractor for signatures, the Contractor shall furnish to the Owner <br /> a certificate or certificates of insurance in a form satisfactory to the Owner. Upon request of the <br /> Owner, the Contractor shall provide the Owner with certified copies of the insurance policies <br /> required by this Article, including without limitation declaration pages, conditions, exclusions and <br /> endorsements, and confirmation that each policy premium has been paid for the required term <br /> of this Agreement. A copy of the umbrella policy shall be provided to the Orange County Risk <br /> Manager. Certificates shall be signed by a person authorized by that insurer to bind coverage <br /> on its behalf. All insurance policies shall provide, as evidenced by Certificates of Insurance, that <br /> the insurance shall not be canceled, reduced, restricted, or changed in any way without at least <br /> 30 days prior written notice to the Owner. <br /> With regard to expiration, cancellation, reduction, restriction, or any other change, certificates <br /> shall state: "Should any of the following described policies be canceled before expiration date or <br /> be due to expire within 30 days, the insurer shall mail 30 days prior written notice to named <br /> certificate holder." In the event of any such cancellation, non-renewal, reduction, restriction, or <br /> change in any insurance, the Contractor is obligated to replace such insurance within 7 days <br /> without a gap in coverage and file accordingly such notice with the Owner, and other interested <br /> parties. Failing immediate receipt of evidence of such replacement of insurance the Owner <br /> reserves the right to procure such insurance as the Owner considers desirable and the <br /> Contractor shall pay or reimburse the cost of the premium in respect thereof. It is expressly <br /> provided, however, that any action or inaction on the part of the Owner in this respect shall in no <br /> way change or reduce the Contractor's responsibilities and liabilities under this Agreement. <br /> Self-funded, policy fronting, or other non-risk transfer insurance mechanisms are not acceptable <br /> without prior written approval of the Owner. Full disclosure of such a program must be made <br /> prior to commencing mobilization to the Project site. Failure to make a full disclosure constitutes <br /> a material breach of the Agreement, justifying termination for default. <br /> The Contractor shall name the Owner, the Designer, the Designer's consultants, and the <br /> Construction Manager as additional insureds under all its insurance contracts (except workers' <br /> compensation) with respect to and including without limitation liability arising out of activities <br /> performed by or on behalf of the Contractor, products and completed operations of the <br /> Contractor, and automobiles owned, hired, leased, or borrowed by the Contractor. The <br /> coverage shall contain no special limitations on the scope of protection afforded to additional <br /> insureds. <br /> For any claims related to this Project, the Contractor's insurance or self-insurance shall be <br /> primary and noncontributory with respect to the Owner's insurance. Any insurance or self- <br /> insurance maintained by the Owner shall be excess and noncontributory with respect to the <br /> Contractor's insurance. All policies of insurance shall contain a clause waiving rights of <br /> subrogation against the Owner, unless the Owner approves otherwise in writing. Limits of <br /> coverage are not to be amended by deductible clauses of any nature without the express written <br /> consent of the Owner. <br /> Revised 12/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.