Orange County NC Website
DocuSign Envelope ID: 12DCC4E1-4D61-4DOE-A2A2-7C6E689613AC <br /> Orange County Southern Expansion Smith Sinnett/2017027 <br /> Phase 1 —Seymour Center Renovation and Addition Orange County <br /> MINORITY BUSINESS PARTICIPATION REQUI.Er-qVIENTS <br /> Provide with the!rid- finder GS 143-128.2(c)the undersigned bidder shall identify on ibMd(identification of <br /> Minority Business Participation Form)the minority businesses that it will use on the project with the total dollar <br /> value of the bids that will be performed by the minority businesses. Also list the good faith efforts(Affidavit A) <br /> made to solicit minority participation in the bid effort, <br /> NOTE:A contractor that performs all of the work with its own workforce may submit an Affidavit(B)to that <br /> effect in lieu of Affidavit(A)required above, The MB Participation Form must still be submitted even if there is <br /> zero participation. <br /> A£ler the bid ape►►i►►g-The Owner will consider all bids and alternates and determine the lowest responsible, <br /> responsive bidder, Upon notification of being the apparent low bidder,the bidder shall then file within 72!lours of <br /> the notification of being(he apparent lowest bidder,the following: <br /> An Affidavit(C)that includes a description of the portion of wade to be executed by minority businesses,expressed <br /> as a percentage of the total contract price,which is equal„to,or more than the 10%goal established. This affidavit <br /> shall give rise to the presumption that the bidder has made the required good faith effort and Affidavit D is not <br /> necessary; <br /> *OR* <br /> If less than the 10%goal, Affidavit(D)of its good faith effort to meet the goal shall be provided. The document <br /> must include evidence of all good faith efforts that were implemented,including any advertisements,solicitations <br /> and other specific actions demonstrating recruitment and selection of minority businesses for participation in the <br /> contract. <br /> Note:Bidders must always submit with their bid the Identification of Minority Business Participation Farm listing <br /> all MB contractors,vendors and supplier§that will be used. If there is no MB participation,(lien enter none or zero <br /> on the farm. Affidavit A or Affidavit B,as applicable,also must be submitted with the bid. Failure to file a <br /> required affidavit or documentation with(lie bid or after being notified apparent low bidder is grounds for rejection <br /> of(he bid. <br /> END OF SECTION 00 42 00 <br /> PROPOSAL FORMS Proposal-7 <br />