Browse
Search
2019-496-E AMS - Muter Construction Seymour Center expansion
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-496-E AMS - Muter Construction Seymour Center expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2019 2:55:22 PM
Creation date
9/6/2019 2:32:31 PM
Metadata
Fields
Template:
Contract
Date
9/10/2019
Contract Starting Date
9/10/2019
Contract Ending Date
10/31/2020
Contract Document Type
Agreement - Construction
Amount
$4,444,500.00
Document Relationships
Agenda 06-18-19 Item 8-l - Authorization for the Manager to Sign a Construction Contract for the Southern Campus Site Improvements, Parking and Seymour Center Expansion
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 06-18-19 Regular Meeting
Minutes 06-18-19 Regular Meeting
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
R 2019-496 AMS - Muter Construction Seymour Center expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 12DCC4E1-4D61-4DOE-A2A2-7C6E689613AC <br /> Orange County Southern Expansion Smith Sinnett/2017027 <br /> Phase 1 —Seymour Center Renovation and Addition Orange County <br /> UNIT PRICES- (Refer to Division 01 Section 01 22 00-Unit Prices for Quantities) <br /> Unit prices quoted and accepted shall apply throughout the life of the contract,except as otherwise specifically <br /> noted. Unit prices shall be applied,as appropriate,to compute the total value of changes in the base bid quantity of <br /> the work and in the given Allowances all in accordance with the contract documents, <br /> Unit Price No. UP/A-l; Unsuitable soils removal and disposal off—site. per cy. Unit Price($) 2-7 r Ub <br /> Unit Price No. UPIA-2; Unsuitable soils removal and disposal on-site; per cy. Unit Price[$} <br /> Unit Price No. UPIA-3; Excavation,removal of unsuitable rock for footings, Unit Price[$) 6 <br /> trench,pits for off-site disposal: per cy. <br /> Unit Price No. UPIA-4; Excavation,removal of bulk rack in open N0'x30') Unit Price <br /> in footings,trench,pits for off site disposal: per cy. <br /> Unit Price No. UPIA-5; Replacement of authorized excavation of unsuitable Unit Price <br /> soils or rock with imported suitable soils: per cy, <br /> Unit Price No. UPIA-6; Replacement of authorized excavation of unsuitable Unit Price[$) 60 <br /> soils or rock with imported Structural fill: per cy,, <br /> i <br /> Unit Price No. UPIA-1; Replacement of autliorizcd excavation of unsuitable Unit Price($) C3 60 <br /> soils or rock with aggregate base(ABC)stone: per eK <br /> � L7 Ca <br /> Unit Price No. UPIA&; ,Replacement of authorized excavation of unsuitable Unit Price <br /> soils or rock with 457 washed stone: per cy, <br /> I <br /> Unit Price No. UP A- ; Geotextile: e}2 r sy., Unit Price[$} <br /> The bidder further proposes and agrees Hereby to commence work under this eon tract on a date to be specified in a <br /> written order of the designer and shall fully complete all work thereunder within the time specified in the <br /> Supplementary General Conditions Article 9. Applicable liquidated damages amount is also stated in the <br /> Supplementary General Conditions Article 9. <br /> i <br /> ADDENDUM <br /> (Addendum received and used in computing bid) <br /> Addendum No. 1 x Addendum No.3 X Addendum No.5 <br /> Addendum No.2 x Addendum No.4 X Addendum No.6 <br /> i <br /> PROPOSAL FORMS Proposal-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.