Browse
Search
2019-496-E AMS - Muter Construction Seymour Center expansion
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-496-E AMS - Muter Construction Seymour Center expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2019 2:55:22 PM
Creation date
9/6/2019 2:32:31 PM
Metadata
Fields
Template:
Contract
Date
9/10/2019
Contract Starting Date
9/10/2019
Contract Ending Date
10/31/2020
Contract Document Type
Agreement - Construction
Amount
$4,444,500.00
Document Relationships
Agenda 06-18-19 Item 8-l - Authorization for the Manager to Sign a Construction Contract for the Southern Campus Site Improvements, Parking and Seymour Center Expansion
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 06-18-19 Regular Meeting
Minutes 06-18-19 Regular Meeting
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
R 2019-496 AMS - Muter Construction Seymour Center expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 12DCC4E1-4D61-4DOE-A2A2-7C6E689613AC <br /> Orange County Southern Expansion Smith Sinnct(/2017027 <br /> Phase I -Seymour Center Renovation and Addition Orange County <br /> SINGLE PRIME CONTRACT- <br /> BASE BID: <br /> Amount: )L.,m 4 r �� ❑ollars {$ Ow 0 ) <br /> ALTERNATE 1: Recessed Mounted Retractable Stage <br /> Amount:�h-U �` �+�Q� ° � C, dollars {$ <br /> ALTERNATE 2:Extension of Existing Entrance Canopy <br /> Amount, t l h.¢-. .Q�L tv,00 15c,�_A Dollars <br /> ALTERNATE 3:Replacement of Existing Great Hall Flooring <br /> Amount:� � .+� �� � �SG"`"1 Dollars ($_Ili 000 ) <br /> ALTERNATE 4:Nooriad Operable Partition(Manual Partition In Base Bid) <br /> Amount:1 _ 1�C J 2- ��t - -- Dollars ($.2 I bo 0 ) <br /> ALTERNATE 5:Additional Storage pp <br /> Amount: _ t#o <br /> l Dollars <br /> ALTERNATE 6: Laticrete Adhered Stone Veneer System(preferred) <br /> Amount: l lC 4�:_O�, LQ Dollars ($ t()00 } <br /> ALTERNATE 7:Owner Preferred Alternate:Door Hardware-Von Duprin Exit Devices/Corbin Locksets <br /> Amount: Dollars ($ } <br /> ALTERNATE 8:Audio Visual Electrical Rough-in <br /> Amount: Ck 4-ae,, s "Ll3y` -1 3 Dollars ($ )�fC)60 ] <br /> ALTERNATE 9:Concrete Paving at Parking Lot(. <br /> Amount: vL v►sa Dollars ($�� <br /> ALTERNATE E-1: EST Quick Start Fire Alarm Manufacturer: <br /> Amount: �►�U �`�t�i U-� "'vq Dollars ($ �� } <br /> PROPOSAL FORMS Proposal-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.