Browse
Search
2019-601-E AMS - Warren Hay Whitted boiler pipe replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-601-E AMS - Warren Hay Whitted boiler pipe replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 3:21:57 PM
Creation date
9/5/2019 2:54:57 PM
Metadata
Fields
Template:
Contract
Date
8/28/2019
Contract Starting Date
8/28/2019
Contract Ending Date
10/31/2019
Contract Document Type
Agreement - Construction
Amount
$50,885.00
Document Relationships
R 2019-601 AMS - Warren Hay Whitted boiler pipe replacement
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Revised 12/18 <br /> <br />4 <br />responsibility to furnish the Owner documentary evidence showing the materials used and <br />sales and use tax paid by the Contractor and each of its subcontractors. <br /> <br />6. INSURANCE AND BONDS <br />a. Minimum requirements – Contractor shall obtain, at its sole expense, Commercial General <br />Liability Insurance, Automobile Insurance, Workers’ Compensation Insurance, and any <br />additional insurance as may be required by Owner’s Risk Manager as such insurance <br />requirements are described in the Orange County Risk Transfer Policy and Orange County <br />Minimum Insurance Coverage Requirements (each document is incorporated herein by <br />reference and may be viewed at <br />http://www.orangecountync.gov/departments/purchasing_division/contracts.php). If <br />Owner’s Risk Manager determines additional insurance coverage is required such <br />additional insurance shall be designated here N/A (if no additional insurance required mark <br />N/A as being not applicable). Contractor shall not commence construction work until such <br />insurance is in effect and certification thereof has been received by the Owner's Risk <br />Manager. <br /> <br />b. Performance Bonds – Contractor shall furnish bonds covering the faithful performance of <br />the Contract and payment of all obligations arising under any of the Contract Documents <br />or related in any way to the Work. Contractor shall immediately furnish a copy of such <br />bonds to any requesting person who appears to be a potential beneficiary of bonds <br />covering payment obligations arising under any of the Contract Documents. This <br />subsection 6(b) applies only to Contracts of fifty thousand dollars ($50,000.00) or more <br />where the total cost for the project is three hundred thousand dollars ($300,000.00) or <br />more. <br /> <br />7. INDEMNITY <br />a. The Contractor shall indemnify, without limitation, and hold harmless to the maximum <br />extent permitted by law the Owner and its agents and employees from and against any and <br />all claims, damages, losses and expenses, including attorney's fees, arising out of or <br />resulting from the performance or nonperformance of the Work, provided that any such <br />claim, damages, loss or expense (A) is attributable to bodily injury, sickness, disease or <br />death or injury to, or destruction of, property, including the loss of use resulting therefrom; <br />and (B) is caused in whole or in part by any breach of any provision of the Agreement or <br />by any negligent or wrongful act or omission of the Contractor, any Subcontractor, or <br />supplier of the Contractor, anyone directly or indirectly employed by any of them or <br />anyone for whose acts any of them may be liable. The indemnification obligation under <br />this paragraph shall not be limited in any way by any limitation of the amount or type of <br />damages, compensation or benefits payable by or for the Contractor or any subcontractor <br />under workers' compensation acts, disability benefits acts or other employee benefit acts. <br /> <br />b. The Contractor shall indemnify and hold harmless Owner from any lien of whatever type <br />through the purchase of appropriate bonds and insurance as designated in Section 6 above. <br />In the event any such lien is filed against Owner’s property Contractor shall, through such <br />bonds and insurance or at Contractors expense, defend Owner against all such claims of <br />lien. <br /> <br />c. Upon completion of the Work the Contractor shall execute an affidavit stating there are no <br />unpaid debts for any work that has been done or materials that have been furnished to the <br />DocuSign Envelope ID: 6ADE3670-5672-4DD4-B793-654D507901E1
The URL can be used to link to this page
Your browser does not support the video tag.